Instructions for work
Precision Seed Drills
MAXIMA 2 M
53
2. Adjustments in working position
Adjusting the seeding unit ground
pressure
The seeding unit ground pressure is modified by
changing the position of springs (1).
Coupling device (a):
By moving one spring (1) rearwards, the seeding unit
ground pressure is increased by 20 kg (44 lb).
Coupling device (b):
By moving 2 springs (1) rearwards, the seeding unit
ground pressure is increased by 40 kg (88 lb).
When the 2 springs (1) are positioned in
configuration (b), check that the frame is
sufficiently ballasted.
The drive wheels must not slip. If necessary
ballast the frame.
Summary of Contents for MAXIMA 2 M
Page 2: ......
Page 212: ...Precision Seed Drills 210 MAXIMA 2 M Appendix T Axle loads Tractor only...
Page 214: ...Precision Seed Drills 212 MAXIMA 2 M Limited warranty Limited warranty...
Page 215: ...Limited warranty Precision Seed Drills MAXIMA 2 M 213...
Page 216: ......
Page 217: ......
Page 218: ......
Page 219: ......
Page 220: ......