Putting into service
Disc mower
GMD802
25
Preparing the machine
Linkage adjustment
Measure dimension A.
If measure A is below 2.10 m (6’11’’):
Place lower links in position (a).
Adjust machine lower hitch pin position:
- Unscrew the 8 bolts (3).
- Position hitch pin (1) at measure A = 10 mm (0.4’’).
- Tighten 4 hitch pin screws (1).
• Torque: 21 daN m (155 lbf ft).
- Position hitch pin (2) at measure B = 825 mm (2’8’’)
- Tighten 4 hitch pin screws (2).
• Torque: 21 daN m (155 lbf ft).
Summary of Contents for GMD802 Series
Page 1: ...KN082DGB D OPERATOR S MANUAL Disc mower GMD802 KN082DGB D English 03 2010...
Page 2: ......
Page 67: ...Limited warranty Disc mower GMD802 65 Limited warranty...
Page 68: ...Disc mower 66 GMD802 Limited warranty...
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......