9. - Optional equipment
EL92-180/205/230
61
KN007CGB_F
Power tiller
9.3.3 Adjustments in working position
Lateral adjustment
- Loosen screw (1).
-
Position track eradicators symmetrically with
regards to the tractor tyre's centre.
A minimum spacing L of 200 mm (7.87’’)
between the 2 track eradicators is
recommended.
- Tighten screw (1):
• Torque: 8.5 daNm (63 lbf ft).
Working depth adjustment
- Loosen counternuts (1).
- Loosen bolts (2).
- Set the required working depth.
The working depth of the track eradicators must
not exceed 50 mm (2’’).
- Tighten counternuts (1).
- Tighten bolts (2).
- Repeat procedure for each track eradicator.
1
L
L
1
2
3