ASSEMBLY INSTRUCTIONS
48
5. Pass the control lever wire harness and the ON/OFF
switch wire harness, as shown in the figure. Fix these
harnesses and the lever cable with the cord band.
A
Tilt the control lever toward the front left of the tractor,
as shown in the figure, to make sure the control lever
wire harness becomes too tight.
6. Cover the control lever cable and the wire harnesses
with the sleeve (original). Using the cord band, secure
these parts back into position.
7. Using the cord band, fix the control lever wire harness
and the control lever cable, located below the step, as
shown in the figure.
8. Attach the relay to the wire hanress, and connect the
wire harness to the tractor and solenoid valve harness.
A
Connect the wire harness couplers of the 3rd function
control lever to their respective same-color couplers.
(1) Control lever harness
(2) ON/OFF switch harness
(3) Lever cable
(4) 2-cord bands
(A) 110 to 130 mm
(4.3 to 5.1 in.)
(B) 110 to 150 mm
(4.3 to 5.9 in.)
(1) Control lever haraness
(A) Toward the tractor front
(B) Toward the tractor left side
(1) Lever harness
(2) Lever cable
(3) Clamp (cord band)
(A) To control lever
(A) To 3rd function control lever
(B) To ON/OFF switch
(C) To tractor harness
(D) To solenoid valve harness-1
(E) To solenoid valve harness-2
(F) To relay
(G) To relay
Summary of Contents for LA1154
Page 57: ...55 ASSEMBLY INSTRUCTIONS TEMPLATE FOR CONTROLLER CABLE ...
Page 58: ......
Page 60: ......