8
Section 1: Assembly & Set-up
AP-SRT62, & AP-SRT76 Rotary Tillers 321-095MK
7/31/17
Depth Indicator Assembly
Refer to Figure 1-2:
1.
Support tiller on a level surface with minimum 7" tall
supports (#7 & #8) under skid shoes (#2) at both
ends of unit. Supports at both ends should be of
equal height.
2.
Verify tiller is level by placing a level (#9) across the
top of the unit as shown.
3.
Attach depth indicator (#1) to one of the gussets (#3)
with 5/16"-18 x 1" GR5 bolts (#5) and hex whiz nuts
(#6). Gusset location is operator preference. Draw
hex whiz nuts (#6) up snug, do not tighten at this
time.
4.
Rotate depth indicator (#1) about upper bolt until
indicator arrow (#4) points to “FULL DEPTH”.
5.
Hold depth indicator in this position and tighten hex
whiz nuts (#6) to the correct torque.
IMPORTANT:
In order for the depth indicator to be
accurately adjusted, the Rotary Tiller must be
parked on ground that is flat and level and resting on
a 7" or taller support at both ends as shown.
IMPORTANT:
Depth indicator is shipped mounted to
the far left gusset (#3) and can be moved to any of
the other gussets (#3) to suit operator preference.
Spring Hose Loop Assembly
Refer to Figure 1-3:
1.
Insert 1/2"-13 x 1 1/2" GR5 carriage bolt (#1) through
opening in end of tiller frame and up through square
hole as shown.
2.
Attach spring hose loop (#4) to tiller frame with flat
washer (#3) and hex whiz nut (#2).
3.
Tighten hex whiz nut (#2) to the correct torque.
4.
Apply silicone caulk around end cap (#5) and press
end cap over hole in end of frame.
Spring Hose Loop Assembly
Figure 1-3
37804
Depth Indicator Assembly
Figure 1-2
37805
Summary of Contents for AP-SRT62
Page 35: ......