15
Section 1: Assembly & Set-up
4/10/19
AP-SR2672, & AP-SR2690 for Skid Steer Powered Rakes 321-004MK
Switch & Wire Harness With Eyelets
Figure 1-10
Control Harness With 2 Eyelets
323-097A . . . . . . . . . . . . . SWITCH & WIRE HARNESS
Refer to Figure 1-10:
This switch and wire harness is designed for attaching
the Powered Rake to a Skid steer without a 2 pin or 14 pin
Deutsch plug. The 2 push button control switch can be
placed approximately 9 ft. from the solenoid valve.
1.
Disconnect negative (-) black ground wire from the
skid steer’s battery post (Not shown).
2.
Attach positive (+) red wire eyelet (A) to a 12 volt
power source. Tighten fastener hardware.
3.
Attach negative (-) black wire eyelet (B) to ground.
Tighten fastener hardware.
4.
Reconnect negative (-) black ground wire to the skid
steer’s battery. Tighten fastener hardware.
5.
The push button control switch (#9) is mounted with
magnets on the back. Locate and mount this switch
in a convenient easy to reach location.
6.
Connect power cord (#8) to control switch wire (#7).
7.
Connect green & black wire connector (#1) to the top
solenoid wire (#2).
8.
Connect red and white wire connector (#3) to the
bottom solenoid wire (#4).
9.
Continue with
Solenoid Valve
37140
Green Wire
Red Wire
Positive (+)
Red Wire
Negative (-) Black Wire
NOTE:
Additional zip ties may be needed to
properly secure all wiring harness. Customer to
supply and locate all additional zip ties.
Operational Check
Refer to Figure 1-7 or Figure 1-10:
1.
With hydraulics hooked-up, start skid steer and press
buttons to angle broom to sweep material to the right
and left.
2.
If broom angles in opposite direction desired, switch
plugs (#1 & #3) with solenoid wires (#2 & #4).
3.
If everything is working correctly, secure
harness (#6) near the solenoid valve with zip tie (#5).
4.
Make certain hydraulic hoses from skid steer to
broom are kept away from all pinch points.
5.
Tie hydraulic hoses and electrical cables together
12" and 29" away from quick release couplers with
zip ties (#5).