MAINTENANCE
OM 0427SB-A
[24]
L
UBRICATION
Use a grease gun and lubricate as follows:
DESCRIPTION
INTERVAL
LUBRICATION REQUIRED
Driveline
4 hours
Grease each universal joint
24 hours
Separate the sliding parts and cover each one of them
with grease
Driving chain
4 hours
and after each operation
Lubricate with chain saw lubricant
Reduction box
& Gearbox
24 hours of operation
Check oil level. If needed, add AGMA 5EP extreme
pressure oil, SAE 80W90 gear oil or equivalent.
Bearing
24 hours of operation
Grease each auger bearing
Chute
16 hours of operation
Oil the pivots
Summary of Contents for 21400001
Page 2: ......
Page 29: ...PARTS OM 0427SB A 26 SNOWBLOWER L4469 L4479 FIG 000100_RAD1501012 ...
Page 37: ...PARTS OM 0427SB A 34 SNOWBLOWER COMPLETION KIT L4431 ...
Page 40: ...AVAILABLE OPTIONS OM 0427SB A 37 SIDE EXTENSIONS L2177 ...
Page 42: ......
Page 43: ......
Page 44: ...Printed in Canada ...