2
SETUP
3
2.1
Unpacking and setting up the vehicle
V00717-10
–
Remove the straps and box.
V00718-10
–
Remove the adhesive tape in the upper area of the motorcycle.
V00719-10
–
Roll down the film at the sides.
Info
To avoid damaging the motorcycle during unpacking, leave the other films
on the vehicle until you have finished work on the vehicle.
–
Remove the separate enclosure and unpack it. Check the separate enclosure for
completeness.
–
Check the vehicle for transport damage.
V00720-10
–
Remove the controls from the transport holder.
–
Remove the screws and handlebar clamps.
–
Remove the transport holder.
V00721-10
–
Remove the right hand guard.
–
Position the controls on the right half of the handlebar. Tighten the screws.
Guideline
Remaining screws, chassis
M5
5 Nm (3.7 lbf ft)
Remaining chassis screws
M6
10 Nm (7.4 lbf ft)
–
Mount the right hand guard.
V00722-10
–
Position the handlebar.
–
Position the handlebar clamps. Tighten the screws evenly.
Guideline
Screw, handlebar clamp
M8
20 Nm
(14.8 lbf ft)
Markings
A
face backwards.
Handlebar scale markings
B
are located centrally between the handlebar
clamps.