12
SERVICE WORK ON THE CHASSIS
60
–
Using a plastic hammer, tap lightly on the upper triple clamp to avoid strains.
–
Tighten screws
.
Guideline
Screw, top triple clamp
M8
17 Nm
(12.5 lbf ft)
–
Mount and tighten screw
.
Guideline
Screw, top steering stem
M8
17 Nm
(12.5 lbf ft)
Loctite
®
243™
M00140-10
(EXC
‑
F Six Days)
–
Release screws
. Remove screw
.
–
Loosen and retighten screw
.
Guideline
Screw, top steering head
M20x1.5
12 Nm
(8.9 lbf ft)
–
Using a plastic hammer, tap lightly on the upper triple clamp to avoid strains.
–
Tighten screws
.
Guideline
Screw, top triple clamp
M8
17 Nm
(12.5 lbf ft)
–
Mount and tighten screw
.
Guideline
Screw, top steering stem
M8
17 Nm
(12.5 lbf ft)
Loctite
®
243™
Finishing work
–
Check the steering head bearing play. (
–
Remove the motorcycle from the lift stand. (
12.15
Adjusting the play of the steering head bearing (XCF
‑
W)
Preparatory work
–
Raise the motorcycle with the lift stand. (
K00144-10
Main work
–
Loosen screws
and
.
–
Loosen and retighten screw
.
Guideline
Screw, top steering head
M20x1.5
12 Nm (8.9 lbf ft)
–
Using a plastic hammer, tap lightly on the upper triple clamp to avoid strains.
–
Tighten screws
.
Guideline
Screw, top triple clamp
M8
20 Nm
(14.8 lbf ft)
–
Tighten screw
.
Guideline
Screw, top steering stem
M8
20 Nm
(14.8 lbf ft)
Finishing work
–
Check the steering head bearing play. (
–
Remove the motorcycle from the lift stand. (
Summary of Contents for 250 EXC-F EU 2010
Page 2: ......