
Installation and Operation Manual 7
3. Safety Instructions
﹡
Please read this manual carefully prior to installation. This
company assumes no responsibility for quality assurance upon
equipment damage due to installation failing to follow instructions
in this manual.
﹡
All operations and wiring shall be conducted by professional
electrical or mechanical engineer.
﹡
Do not move other parts inside the machine case except the
binding post during installation.
﹡
All electrical installations must conform to local standards for
electrical installation.
﹡
Please contact with local appointed personnel for system
installation and maintenance if this equipment requires the
maintenance.
﹡
Use of this equipment for grid-connected power generation must be
approved by local power supply departments.
﹡
When the photovoltaic array is installed in the day, it shall be
covered with lightproof materials; otherwise the array end will
subject to high voltage under exposure of sunlight, thus causing
personal risk.
Warning!
Ensure that the input DC voltage does not exceed 1000V
since higher input voltage may damage this equipment
permanently and causing other losses, under which
circumstance, this company assumes no responsibility for
quality assurance and joint responsibility.