
Installation and Operation Manual 34
8. Installation
8.1 Overview
The installation introduction of KSG-12K inverter is as follows.
Please read this chapter carefully to help you install the KSG-12K
photovoltaic grid-connected inverter correctly.
Inspection of damage during transportation
The KSG-12K inverter may be damaged during transportation
even if we have conducted the test and detection for it before
transportation. Therefore, please inspect it before installation. If
any damage is detected, please contact with the transportation
company or our company directly. We will provide you with the best
and quickest service after you provide the photo of damaged part.
Basic installation requirement
The KSG-12K inverter can be installed outdoors with water-proof
and dust-proof level of IP65. Some basic installation
requirements are as follows:
It is the best to install it in the place where it is away from the
living area due to some noise produced during its operation
(<40dB).
Assure there is no shake in the installation place.
Assure that the LED light or LCD can be observed conveniently
installation place.
Assure that the ambient temperature is of -25°C ~ +60°C.
Good ventilation is required.
Clean installation environment is required.