KSB moviBOOST Vt Manual Download Page 3

moviBOOST Vt

2

Work on the machine / unit must be carried out only during

standstill. The shutdown procedure described in the manual for

taking the unit out of service must be adhered to without fail.
Pumps or pump units handling fluids injurious to health must be

decontaminated.
Immediately following completion of the work, all safety-relevant

and protective devices must be re-installed and / or re-activated.

Please observe all instructions set out in the chapter on

“Commissioning / start-up” before returning the unit to service.

2.7

Unauthorised modification and manufacture

of spare parts

Modifications or alterations of the equipment supplied are only

permitted after consultation with the manufacturer. Original spare

parts and accessories authorised by the manufacturer ensure

safety. The use of other parts can invalidate any liability of the

manufacturer for resulting damage.

2.8

Unauthorised modes of operation

The warranty relating to the operating reliability and safety of the

unit supplied is only valid if the equipment is used in accordance

with its designated use (see section 4). The limits stated in the

data sheet must not be exceeded under any circumstances.

3

Transport and interim storage

The package unit is packaged on pallets or in wooden crates

and wrapped in plastic foil for shipping and interim storage. All

connecting points are capped. It is imperative that the shipping /

handling instructions shown on the package be followed.

The unit must be protected against frost.

If upon unpackaging the unit you should discover that the package

has been damaged by dropping or some other form of mechanical

impact, please carefully inspect the unit itself for possible damage

and inform the freight forwarder / KSB’s customer service, even

if you have not been able to detect any such damage.
Once the unit has been removed from the package, it must be

stored in accordance with the location and installation instructions

(see Installation and location).

4

Description

4.1

General description

The fully electronic pressure boosting package units are supplied

ready for connection.
The equipment circuitry allows both direct and indirect connection

to the water supply system.

The equipment must be operated and maintained as to ensure

uninterrupted reliability of water supply, without causing

disturbances in the public water supply or other consumer

supply systems.

Any applicable 

Water utility or fire protection regulations

 must

be complied with.
Furthermore, local conditions must be taken into account (for

example excessive or very unsteady supply pressure requiring

the installation of a pressure reducer).

4.2

Configuration and function

4.2.1 Configuration

Between 2 and 6 vertical high-pressure pumps (for description

and function, please refer to the pump’s Operating Instruction)

are arranged on a baseplate.
Each pump is seated on its own anti-vibration mounts.
The pumps are arranged in line are coupled by mild steel pipes.
On the system side, a swing check valve and a shut-off butterfly

valve are fitted downstream of each pump.
On the suction side, a ball valve or a shut-off butterfly valve are

fitted upstream of each pump as a service valve.
The shut-off elements permit dismantling of individual pumps

without having to drain the pipework. The discharge side non-

return valve ensures that the unit remains filled with water and

prevents backflow through the pumps.
Both headers feature additional connections for draining, venting

and installation of various dry running protection devices.
The accumulator is fitted with an isolating valve. It compensates

discharge-side peak pressures and together with the minimum

operating period, limits the pumps’ switching frequency.
moviBOOST Vt units are started up as a function of pressure.

To this effect, a pressure transmitter is fitted in the discharge-

side piping.
Depending on the number and power of the pumps, the

completely wired control cabinet is either supplied mounted on

the baseplate or as a free-standing cabinet.
Only supplementary and special equipment is supplied fitted on

the unit.
Accessories such as expansion joints, tanks, accumulators,

pressure reducers etc. are supplied with the unit but are not

mounted.
The unit is driven by surface-cooled three-phase squirrel-cage

motors, 50 Hz, air-cooled, 2-pole, KSB standard motor with main

dimensions to IEC. Other motor makes after consultation with

KSB.
up to 2.2 kW 220-240 V/380-420 V,

from 3 kW 380-420 V/660-725 V

enclosure IP 55, thermal class F, up to 4 kW design V18,

from 5.5 kW design V1

4.2.2 Function

moviBOOST Vt is started as a function of pressure and stopped

as a function of demand.

Automatic mode

The pressure boosting unit consisting of 2 to 6 pumps starts up

the first pump as soon as  the actual system pressure is approx.

0.3 bar lower than the pre-set system pressure.
The pump is speed-controlled via frequency inverter as a function

of service demand. If the first pump cannot meet the demand,

this is recognised by the control system, and the next pump

available is started. This routine is repeated until all pumps are

running. The system pressure is maintained at a constant level

by means of the frequency inverter controlled pump.
If the unit has been correctly selected, it must be capable of

covering the demand without using the stand-by pump.

Summary of Contents for moviBOOST Vt

Page 1: ...nts 6 6 6 Installation altitude 6 6 7 Pollution exposure 6 6 8 Checking the voltage 6 6 9 Logic circuit diagrams 6 6 10 Over load relay 6 6 11 Potential equalization 6 Contents Sr no Description Page no 7 Commissioning start up 6 7 1 Preparations for commissioning start up 6 7 2 Test run 6 7 3 Checking the direction of rotation 7 7 4 Functional description Automatic mode 7 7 5 Starting the unit 7 ...

Page 2: ...ings for fluid connections must always be complied with and be kept in a perfectly legible condition at all times 2 2 Personnel qualification and training All personnel involved in the operating maintaining servicing inspecting and installing the unit must be fully qualified to carry out the work involved Areas of responsibility and personnel monitoring must be clearly specified by the operator If...

Page 3: ...nsteady supply pressure requiring the installation of a pressure reducer 4 2 Configuration and function 4 2 1 Configuration Between 2 and 6 vertical high pressure pumps for description and function please refer to the pump s Operating Instruction are arranged on a baseplate Each pump is seated on its own anti vibration mounts The pumps are arranged in line are coupled by mild steel pipes On the sy...

Page 4: ...nded for the dry running device is open If no dry running protection device is connected when commissioning takes place the unit will be stopped after 7 seconds If the dry running protection terminal is deactivated by means of a bridge the operator shall assume responsibility for any dry running that might occur 4 4 Manual mode Each pump can be started up in manual mode for 10 seconds via the cont...

Page 5: ...ut off elements 10 Pressure transmitter 11 Pressure reading indicator 12 Control system 13 Pump with drain and vent valve 14 Non return valve NRV 15 Discharge pipe 16 Accumulator discharge pressure side 17 Pressure reducer discharge pressure side 18 Distribution line downstream of moviBOOST 19 Consumer line downstream of moviBOOST 20 By pass line for direct connection only 21 Consumer line upstrea...

Page 6: ...ansion joints The unit must be accessible to allow maintenance and repair work 5 6 Installing a pressure reducer A length of approximately 600 mm must be provided on the inlet pressure side to accommodate a pressure reducer if necessary A pressure reducer must be installed if the inlet pressure fluctuation is so high that the unit must be stopped or if the total system pressure inlet pressure plus...

Page 7: ...r may contain dry dust comparable to that normally encountered in work environments with no extraordinary machinery induced dust accumulation Exposure to unusually high dust levels acids corrosive gases salts etc must be avoided 6 8 Checking the voltage Compare the mains voltage with the name plate data and the control unit s circuit diagram 6 9 Logic circuit diagrams For each unit are included in...

Page 8: ...t operation each pump must be started up individually to check the direction of rotation If a pump is found to be running in the wrong direction switch two phases on the motor terminal board 7 4 Functional description Automatic mode After start up pressure boosting units in standard design will run in automatic mode For units with manual 0 automatic switch set all pumps to automatic mode Each pres...

Page 9: ...r Name Line 3 Parameter Value Line 4 Alarm Line 7 5 2 Menu structure Main Screen Select Group Status No of Pumps Suction Water status Pump 1 status Pump 2 status Pump 3 status Pump 4 status Pump 5 status Pump 6 status Service Interval Sensor Pressures Settings User Level Settings Service Level Settings Factory Level Settings Information Diagnostic Active Alarms Alarm History 7 5 3 Access Level Var...

Page 10: ...meter press 0 Number can then be entered digit by digit from left to right by numeric keys To confirm the selected value press ENTER The cursor moves to the next position second position from the left Make the settings as described above fo the subsequent positions and then save the new parameter value by pressing ENTER Press 8 repeatedly to return to the main display The new setpoint is now activ...

Page 11: ... 12 Settings Usr Drive Min Freq 25 Hz 3 2 2 14 Settings Usr Accumutaton SP 0 50 3 2 2 15 Settings Usr Accumltion_Time 3 Sec 3 2 2 16 Settings Usr Shut Off Head 0 00 3 2 2 17 Settings Usr NO Flow time 30 Sec 3 2 2 18 Settings Usr Hi Presr Actn 0 3 2 2 19 Settings Usr Hi Pressr Alm 0 00 Bar 3 2 2 20 Settings Usr Hi Presr Alm Dly 5 Sec 3 2 2 21 Settings Usr Lo Pressr Actn 0 3 2 2 22 Settings Usr Lo P...

Page 12: ...ngs Service Hi Presr Alm Dly 5 Sec 3 2 2 21 Settings Service Lo Pressr Actn 0 3 2 2 22 Settings Service Lo Presr Alm 0 00Bar 3 2 2 23 Settings Service Lo Presr Alm Dly 5 Sec 3 2 2 24 Settings Service Run Chk Duration 10 Sec 3 2 2 25 Settings Service Discharge V Press 1 K 2 V V 3 2 2 26 Settings Service Ack Vfd Fail Alm Press 1 3 2 2 27 Settings Service Sensor Sel Actn 0 3 2 2 28 Settings Service M...

Page 13: ...m Dly 0 Sec 3 2 3 21 Settings Factory Lo Pressr Actn 0 3 2 3 22 Settings Factory Low Pressure 0 00Bar 3 2 3 23 Settings Factory Low Presr Alm dly 0 Sec 3 2 3 24 Settings Factory Run Chk Duration 0 Sec 3 2 3 25 Settings Factory Discharge K Press 1 K 2 V 3 2 3 26 Settings Factory Ack VFD Fail Alm Press 1 3 2 3 27 Settings Factory Sensor Sel Actn 0 3 2 3 28 Settings Factory Max Set Point 0 00Bar 3 2 ...

Page 14: ...on the rating plate If the setpoint needs to be adjusted to the site conditions parameter 3 2 3 9 has to be changed First enter the customer password as described under 7 5 2 1 Access levels customer Then change the setpoint as described under 7 5 2 2 7 10 2 Further settings If any further settings have to be adjusted to the site conditions change their parameters as described in section 7 5 2 2 R...

Page 15: ...e power supply i e all electric devices are still live even if the pumps are not in automatic operation mode Prior to working on the control cabinet or opening the motor terminal box set the master switch to 0 and unscrew the back up fuse Do not tamper with the control unit which should only be serviced by KSB s customer service Prior to opening any electric equipment such as control cabinet and m...

Page 16: ...vitec 400 V Number of pumps motors pumps kW A 2 3 4 5 6 0202B 0 37 0 94 1 3 2 2 6 3 3 3 9 0203B 0 37 0 94 1 3 2 2 6 3 3 3 9 0204B 0 37 0 94 1 3 2 2 6 3 3 3 9 0205B 0 37 0 94 1 3 2 2 6 3 3 3 9 0206B 0 55 1 33 1 9 2 8 3 7 4 7 5 6 0207B 0 55 1 33 1 9 2 8 3 7 4 7 5 6 0208B 0 55 1 33 1 9 2 8 3 7 4 7 5 6 0209B 0 75 1 68 2 4 3 6 4 7 5 9 7 0210B 0 75 1 68 2 4 3 6 4 7 5 9 7 0211B 1 1 2 4 3 4 5 1 6 7 8 4 10...

Page 17: ...15 5 9 8 8 11 6 14 5 17 4 1503B 3 5 59 7 9 11 8 15 7 19 6 23 4 1504B 4 7 45 10 6 15 7 20 9 26 1 31 2 1505B 5 5 10 14 2 21 1 28 1 35 41 9 1506B 5 5 10 14 2 21 1 28 1 35 41 9 1507B 7 5 13 4 19 28 3 37 6 46 9 56 2 1508B 7 5 13 4 19 28 3 37 6 46 9 56 2 2502B 4 7 45 10 6 15 7 20 9 26 1 31 2 2503B 5 5 10 14 2 21 1 28 1 35 41 9 2504B 7 5 13 4 19 28 3 37 6 46 9 56 2 2505B 11 19 3 27 4 40 8 54 2 67 5 80 9 ...

Page 18: ...1 29 90B 2 2 47 90B 2 1 52 90B 2 58 90B 3 2 75 90B 3 1 81 90B 3 87 90B 4 2 105 90B 4 1 110 90B 4 117 90B 5 2 134 90B 5 1 140 90B 5 146 90B 6 2 163 Pump Shutoff head 10B 4 46 10B 5 57 10B 6 69 10B 7 80 10B 8 92 10B 9 103 10B 10 114 10B 11 126 10B 13 148 10B 15 171 10B 17 194 10B 19 217 10B 21 239 15B 1 15 15B 2 29 15B 3 43 15B 4 57 15B 5 72 15B 6 86 15B 7 100 15B 8 114 15B 9 129 15B 10 143 15B 11 1...

Page 19: ...tated in the Contact KSB 9 purchase order Start up pressure set too high Check setting 10 Pressure transmitter set incorrectly or Check setting 11 defective Pre charge pressure of the accu too low Restore nitrogen cushion 12 Defective accumulator Check integrity replace 13 Defective mechanical seal Replace by new one 14 Suction side pressure transmitter mano Check setting 15 metric switch set inco...

Page 20: ...t pressure monitoring pvor x ______________________ Value set at inlet pressure switch Stop pressure pA bar ______________ Inlet pressure pvor bar ______________ Pre charge pressure of accumulator pvor bar ______________ 4 Special information The system operator must notify the responsible water company of commissioning If in addition the system is operated with pressure vessels of groups III IV t...

Page 21: ... switch Briefly start up each pump manually and compare the fan impeller s direction of rotation with the arrow indicating the direction of rotation 10 Check the direction of rotation in automatic mode 11 Check the start and stop pressure readjust if required 12 Test the proper function of the lack of water and dry running protection equipment If not fitted make a relevant note in the commissionin...

Page 22: ...redients Disposal Methods 1 Pumps Paint Pump body Base frame Sludge to be disposed through authorised re processor Non ferrous parts a Impellers Diffusers b Bushes c Stage sleeves d Thrust plate To be disposed through authorized re processor e Wearing ring f Coupling Guard g Brg Guard Rubber Plastic Parts a Cover for NRV b Plastic cap To be disposed through authorized re processor c Nozzle blankin...

Page 23: ...moviBOOST Vt NOTES ...

Page 24: ...moviBOOST Vt NOTES ...