13 Commissioning Report
88 of 92
KSB Delta Macro
1983.843/04-EN
13 Commissioning Report
The pressure booster system specified below has been commissioned today by the undersigned, authorised KSB
Service who created this report.
Pressure booster system details
Type series
........................................................................................................................................
Size
........................................................................................................................................
Serial number
........................................................................................................................................
Order No.
........................................................................................................................................
Purchaser/place of installation
Purchaser
Place of installation
Name
....................................................
..........................................................................
Address
....................................................
..........................................................................
....................................................
..........................................................................
Operating data
For further data refer to the wiring diagram.
Start-up pressure
p
E
bar
....................................................
Inlet pressure monitoring p
inl
- x
(setting of inlet pressure switch)
....................................................
Stop pressure
p
A
bar
....................................................
Inlet pressure
p
inl
[bar]
....................................................
Pre-charge pressure
of accumulator
p
pre-charge
[bar]
....................................................
The operator or operator’s representative herewith confirms to have received instructions on how to operate and
service the pressure booster system. The relevant circuit diagrams and operating instructions have been handed
over.
Non-conformities found during commissioning
Deadline for remedial action
Non-conformity 1................................................................................. ..........................................................................
.............................................................................................................
..........................................................................
.............................................................................................................
..........................................................................
.............................................................................................................
..........................................................................
Name of KSB representative
Name of purchaser or representative
.............................................................................................................
..........................................................................
Place
Date
.............................................................................................................
..........................................................................