5 Installation at Site
17 of 40
BOA-H Mat P
5 Installation at Site
5.1 General information/Safety regulations
The consultant, construction company or operator are responsible for positioning
and installing the valves. Planning errors and installation errors may impair the
reliable function of the valves and pose a substantial safety hazard.
WARNING
Damage to pressure enclosure or add-on parts
Leakage from or rupture of the valve
Valve/add-on parts not functional
▷
Check the valve for in-transit damage prior to installation.
▷
Check any add-on parts for in-transit damage.
▷
Do not install damaged valves.
CAUTION
Welding in close proximity to soft-seated valves
Damage to the seat/disc interface!
▷
Ensure that the valve is not heated beyond the specified temperature limits.
(
5.2 Installation position
WARNING
Installation of the valve with the stem pointing downwards
Damage to the valve!
▷
Install the valve with the stem pointing upwards or to the side.
▷
Observe the permissible installation position.
CAUTION
Actuators installed in an inclined position of 30° or more off the vertical
No valve function!
▷
Support actuators > 13 kg.
Summary of Contents for BOA-CVP H
Page 1: ...Automated Globe Valves BOA H Mat P Installation Operating Manual...
Page 38: ......
Page 39: ......