✓
The submersible mixer is mounted on the installation set and located completely
outside the fluid handled.
If tank is filled: Mixer mounted on the guide rail and suspended from lifting
gear.
If tank is empty: Mixer mounted on the guide rail and in operating position.
✓
The submersible mixer is connected to the power supply.
1. Start the submersible mixer and stop it again immediately to determine the
direction of rotation.
2. Check the direction of rotation.
Propeller rotation must be anti-clockwise (looking at the propeller hub). (See
rotation arrow on the housing)
3. If the mixer is running in the wrong direction of rotation, check the electrical
connection of the mixer and the control system, if necessary.
4. Lower the submersible mixer into its operating position. (
Fig. 6: Checking the
direction of rotation
5 Installation at Site
22 of 52
Amamix® direkt
Goodnal STP ST041 Biological Treatment (KSB Amamix Direct Installation and Operation Manual) Vendor Manual
Q-Pulse Id VM385
Active 29/10/2013
Page 22 of 52