1. Check structural requirements.
All structural work required must have been prepared in accordance with the
dimensions stated in the outline drawing/general arrangement drawing.
5.2.3 Checking the lubricant level
903.01
411.01
Fig. 3: Checking the lubricant
The lubricant reservoirs are filled with an environmentally-friendly, non-toxic
lubricant at the factory.
✓
The propeller has been removed. (
1. Position the submersible mixer as shown.
2. Undo screw plug 903.01 and joint ring 411.01.
⇨
The lubricant level must reach the filler opening.
3. If the lubricant level is lower, top up lubricant through the filler opening until
the lubricant reservoir overflows.
4. Fit screw plug 903.01 and joint ring 411.01 again.
5. Fit the propeller. (
5.3
Setting up the submersible mixer
CAUTION
Incorrect installation position of submersible mixer
Damage by excessive stresses or strains!
▷
Observe the data given in the general arrangement drawing.
▷
Installation in other positions is only permitted after prior consultation with and
approval by KSB.
Mount the submersible mixer on the applicable installation set as described in the
separate "Installation parts/accessories" installation instructions.
5.4
Electrical connection
5.4.1 Information for planning the control system
For the electrical connection of the submersible mixer observe the wiring diagrams
contained in the Annex.
The submersible mixer is supplied with a power cable and is wired for DOL starting.
Star-delta starting is possible with 8-pole and 12-pole motors.
NOTE
When laying a cable between the control system and the submersible mixer's connection
point, make sure to have a sufficient number of cores for the sensors! A minimum cable
cross-section of 1.5 mm² is required.