6 Commissioning/Start-up/Shutdown
25 of 60
Ama-Drainer 4../5..
6 Commissioning/Start-up/Shutdown
6.1 Commissioning/Start-up
6.1.1 Prerequisites for commissioning/start-up
Before commissioning/starting up the pump set, make sure that the following
conditions are met:
▪
The operating data has been verified.
▪
The pump (set) has been installed and connected as described in this manual.
▪
The pump set has been properly connected to the power supply and is equipped
with all protection devices.
▪
The direction of rotation has been checked.
6.1.2 Start-up/shutdown
Type SE/SD
A
B
Fig. 4:
Start-up/switch-off level
A
Start-up level
B
Switch-off level
The pump (set) has been properly connected to the electric power supply
The pump's automatic control system will start up when level "A" is reached and
switched off when level "B" is reached.
Type NE/ND
The pump (set) does not need to be started up or switched off.
It is operational as soon as it has been properly connected to the electric power
supply.
ü
The pump (set) has been properly connected to the electric power supply.
1. Check that the pump operates in submerged condition.
NOTE
A small quantity of the fluid handled will spray out into the protective casing
through an internal vent bore and escape between the protective casing and the
pump casing.