GB-5
D
GB
F
NL
I
E
Installing the burner insert
▷
The burner insert can be rotated to the required
position in increments of 90°.
▷
Insert the gas housing gasket between the
burner insert and the air housing.
▷
On ZIOW, avoid the formation of dust and do
not damage the surface of the internal insulation.
1
2
▷
Tighten the burner insert in a crosswise fashion
with max. 37 Nm (27.3 lbf ft).
Wiring
DANGER
Electric shocks can be fatal! Before working on
possible live components, ensure the unit is discon-
nected from the power supply.
▷
For the
ignition and ionization cables
, use (un-
screened) high-voltage cable:
FZLSi 1/6 up to 180°C (356°F),
Order No. 04250410, or
FZLK 1/7 up to 80°C (176°F),
Order No. 04250409.
I
Z
Ionization electrode I
▷
Install the ionization cable well away from mains
cables and interference from electro-magnetic
sources and avoid external electrical interference.
Max. length of ionization cable – see automatic
burner control unit operating instructions.
▷
Connect the ionization electrode to the automatic
burner control unit via the ionization cable.
Ignition electrode Z
▷
Length of ignition cable: max. 5 m (15 ft), recom-
mended < 1 m (40").
▷
For permanent ignition, max. ignition cable length
1 m (40").
▷
Lay the ignition cable individually and not in a
metal conduit.
▷
Install the ignition cable separately from ionization
and UV cables.
▷
A
≥
7.5 kV,
≥
12 mA ignition transformer is rec-
ommended; 5 kV for ignition lance.
Ionization and ignition electrodes
1
3
2
4
5
6
Connect the PE wire for burner ground to the
burner insert. In the case of single-electrode op-
eration, route the PE wire from the burner insert
directly to the terminal on the automatic burner
control unit.
WARNING
High-voltage risk! It is essential that a high-voltage
warning label is attached to the ignition cable.
7
For more detailed information on how to wire
the ionization and ignition cables, refer to the
operating instructions and connection diagrams
of the automatic burner control unit and ignition
transformer.