Installation and
operating
instructions
IFC 090 K
IFC 090 F
Signal converters
for
electromagnetic flowmeters
11/97
How to use these Instructions
The flowmeters are supplied ready for operation.
The primary head must be installed in the pipeline as described in the installation
instructions inside the packing of the primary head.
- Installation location and connection to power (Section 1)
Pages 1/1-1/6
- Electrical connection of outputs and inputs (Section 2)
Pages 2/1-2/6
- Factory settings and start-up (Section 3)
Pages 3/1-3/2
Power the flowmeter. THAT’S ALL. The system is operative.
Operator control of the IFC 090 signal converter is described in Sections 4 and 5.
Pull-out condensed instructions are located in the centrefold of this manual, pages A – D.
3.1M61EA3 119721
Order No. DIN A4: 7.02144.33.00
US size: 7.02144.73.00