USER’S MANUAL
9
Supply at the same time
-Connect to the power supply jack of control box (400V or 230V)
Requirements:
-Concrete type 425#, the period of desiccation is 15 days.
-Clean the basic layer, thickness of concrete
≥
150mm, the leveling of whole length
≤
5mm.
Chapter 2 SPECIFICATION
THE LOWER PARTS OF THE VEHICLES UNDERBODY COULD
INTERFERE WITH STRUCTURAL PARTS OF THE LIFT, TAKE
PARTICULAR PARTS OF THE SPORTS-CAR.
The lift will also handle customized or non-standard vehicles provided they are within
the maximum specified carrying capacity.
Also the personnel safety zone must be defined in relation to vehicle with unusual
dimensions.