Kostal BYD HV H11.5 Manualline Download Page 3

 

 

Seite 3 / 12 

 DOC_Guide_PLENTIOCRE_BYD_ 2019-04-17-FW_1.20_EN 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The Modbus RTU interface (A) is preconfigured as standard with the readout intervals 
for the PLENTICORE plus or PIKO IQ inverters. 

 

The KOSTAL Smart Energy Meter can be installed directly in the sub-distribution 
cabinet and connected to the inverter without a PC (adjustment of parameters) and 
other settings. The device is immediately ready for use. 

 

 

 

 

 

 

 

 

 

 

 

ATTENTION: 

The B-control EM300 LR and the KOSTAL Smart Energy Meter 

have different RS485 pin connections.

 

Summary of Contents for BYD HV H11.5

Page 1: ...and installation The trademarks trade names product descriptions and other designations used may be protected by law even without special designation e g as trademarks KOSTAL Solar Electric GmbH does...

Page 2: ...or on the supply lines Refer to the relevant operating instructions for the respective devices inverter battery Install PLENTICORE plus inverter connect AC cables and control cables but DO NOT start u...

Page 3: ...NTICORE plus or PIKO IQ inverters The KOSTAL Smart Energy Meter can be installed directly in the sub distribution cabinet and connected to the inverter without a PC adjustment of parameters and other...

Page 4: ...BCU of the BYD Battery Box HV via WLAN Activating the WLAN on the computer Select the BYD battery from the list of devices in the WLAN network Enter the network key for the WIFI of the BYD battery acc...

Page 5: ...st be entered Then click on the Next button Series Battery Counts Enter number of memory modules 4 to 9 Inverter Select inverter manufacturer KOSTAL Country Select your country e g Germany Finally cli...

Page 6: ...he installation assistant appears in the inverter display Commissioning can be carried out completely via the display Simply follow the instructions on the display Alternatively the commissioning can...

Page 7: ...Seite 7 12 DOC_Guide_PLENTIOCRE_BYD_ 2019 04 17 FW_1 20_EN All other settings can now be entered in the service menu Service menu Energy management Choice of energy meter and position of the sensor...

Page 8: ...with the Energy Manager from B control the EM300 LR as well as with the KOSTAL Smart Energy Meter KSEM IMPORTANT The sensor Energy Manager Meter must be mounted in the Mains connection point position...

Page 9: ...Seite 9 12 DOC_Guide_PLENTIOCRE_BYD_ 2019 04 17 FW_1 20_EN Service menu Battery settings All settings for the connected battery made here...

Page 10: ...is available Download from our homepage Download and install the software for the PLENTICORE plus inverter that was released up to date at the time of installation This software can be downloaded fro...

Page 11: ...EC 5095 The inverter cannot measure the battery voltage at DC input 3 With this message no voltage is detected at the DC3 input of the WR from the battery Is the battery on the circuit breaker switch...

Page 12: ...h you will find a list of working combinations in the official Telekom Helps Community https telekomhilft telekom de t5 Fernsehen EntertainTV neu Liste funktionierender Kombinationen mit WLAN td p 186...

Reviews: