![Kostal BYD HV H11.5 Manualline Download Page 2](http://html1.mh-extra.com/html/kostal/byd-hv-h11-5/byd-hv-h11-5_manualline_1999369002.webp)
Seite 2 / 12
DOC_Guide_PLENTIOCRE_BYD_ 2019-04-17-FW_1.20_EN
IMPORTANT INFORMATION
Installation may only be carried out by a trained and qualified electrician!
Observe the safety instructions in the operating instructions for the inverter and
the battery.
In order to start up the system completely and to make all necessary settings,
the Service/PARAKO password and a computer/tablet as well as the battery
activation code are required.
The inverter and the battery must be completely disconnected from the voltage supply for all work on the inverter
or on the supply lines. Refer to the relevant operating instructions for the respective devices (inverter/battery).
Install PLENTICORE plus inverter, connect AC cables and control cables but
DO
NOT
start up yet.
DO NOT
yet connect the DC plug of the PV strings to the inverter.
Connect DC cable, connect ground cable, connect RS485 cable to the BCU and to
the SCB of the WR, but
DO NOT
yet put into operation.
DO
NOT
yet connect the DC plug of the battery to the inverter.
Install the Energy Meter or Energy Manager and connect the RS485 cable to the SCB
of the inverter.
Establish LAN connection between inverter and router (customer network).
Connection of the RS485 cable of the Energy Meter or Energy Manager with the SCB (X452) of
the PLENTICORE plus inverter.