GB-101_f.
3
Connection to the central heating system
Cylinder must be fitted to the central heating system by pipe unions 1″. A cut-off valves
must be installed before the pipe unions. A flow rate of heating water must be high
enough to maximise cylinder efficiency (see ‚Technical data table). It concerns the forced
circulation installation (with a central heating water pump).
Model SWVPC is equipped in double heating coil.
CW
ZWEZ
C
PG-CO
ZB
NW
ZG-CO
PG-PC
ZG-PC
S
Description of device
Cylinder SWVPC is a device with double tank intended to heating medium system with
heat pump.
The upper tank is enamelled with double heating coil, intened to prepare domestic hot
water.
In the lower part, there is a buffer with unenamelled tank, anti-corrosion inhibitor protected
for transport.
Buffer is intened only for work in the heating system. Can’t work with domestic hot water.