1.  Read and strictly follow this installation and operating instructions to ensure a long 

life and reliable cylinder operation.

2.  The manufacturer of this cylinder will not be liable for any damages due to the failure 

to follow the installation and operation instructions.

3.  The cylinder must not be installed in rooms where the temperature may drop below 

0°C.

4.  The cylinder installation and the initial start-up, as well as all electrical and hydraulic 

work must be performed by a qualified professional installer.

5.  The cylinder is designed for vertical installation only (screw on feet).
6.  The device must be installed in such a place and in such a way in order not to flood 

the room in case of the emergency water leak.

7.  Connections to water supply system, central heating system, and solar collectors 

must be made in accordance with the diagram in this installation instruction. Failure 

to follow the installation instruction invalidate the warranty and may cause cylinder’s 

damage. 

8.  A connection to water supply system must be made in accordance with legally binding 

norms.

9.  The cylinder is a pressure appliance designed for connection to the water supply 

system where the water pressure doesn’t exceed 0,6 MPa. If the water pressure 

exceeds 0,6 MPa, the pressure reducing valve before cylinder must be fitted. 

10.  A small leak from the safety valve through the outlet pipe may occur- it’s a normal 

operating state of the appliance. The outlet pipe has to remain open. Do not clog 

it, as a clogged outlet may lead to the breakdown of the cylinder.

11.  Do not use the cylinder if you suspect that the safety valve may be faulty.
12.  The tank is equipped with magnesium anode- an additional protection against 

corrosion. The anode is an operating part, therefore, it is exposed to wear.  

The condition of the magnesium anode should be controlled every 12 months. 

The anode must be replaced once every 18 months.

13.  Rated temperature of water in the cylinder should not exceed 80°C.  

The cylinder is suitable for fitting an immersion heater with thermostat e.g. GRW 1.4, 

GRW 2.0. The immersion heater must be fitted in lieu of cork 1½″.

A maximum length of immersion heater is 450mm.

Summary of Contents for SWVPC-200/100

Page 1: ...SWVPC 200 100 Domestic Hot Water Cylinder With Ch Buffer Tank Assembly and operating manual ...

Page 2: ...nder s damage 8 Aconnection to water supply system must be made in accordance with legally binding norms 9 The cylinder is a pressure appliance designed for connection to the water supply system where the water pressure doesn t exceed 0 6 MPa If the water pressure exceeds 0 6 MPa the pressure reducing valve before cylinder must be fitted 10 A small leak from the safety valve through the outlet pip...

Page 3: ...ation with a central heating water pump Model SWVPC is equipped in double heating coil CW ZWEZ C PG CO ZB NW ZG CO PG PC ZG PC S Description of device Cylinder SWVPC is a device with double tank intended to heating medium system with heat pump The upper tank is enamelled with double heating coil intened to prepare domestic hot water In the lower part there is a buffer with unenamelled tank anti co...

Page 4: ...alve to the water system install the cut off valve on cold water supply pipe Hot water outlet should be led to the connections in the upper part of the cylinder Every cylinder is equipped with connection intended for its installation to the DHW circulation The buffer tank can be assembled in the heating system open system according to the current standards closed system according to the current st...

Page 5: ... Start up Before the start up make sure that the installation procedures have been carried out in accordance with the regulations included in this manual Cylinder must be filled with water turn on the valve on cold water supply pipe turn on the hot water outlet valve water outflow without the air bubbles indicates that the tank is full turn off the outlet valves Turn on the valves connecting cylin...

Page 6: ...ater hardness The cleaning should be done by a qualified person Always tighten the lid s screws to the correct torque of 18 22Nm The wear condition of the anode must be inspected annually The anode must be replaced once every 18 months anode rod replacement 3 take off upper lid 1 take out an insulation ring turn off the cut off valve on cold water supply pipe turn on the hot water valve mixer tap ...

Page 7: ... Rated temperature C 80 Surface area of heating m2 2 6 Capacity of coil dm3 14 Power of coil kW 70 22 Efficiency of coil l h 1800 550 Weight without water kg 142 Magnesium anode M8 ø40 mm 400 80 10 45 C 55 10 45 C heating water temp supply water temp domestic water temperature flowrate of heating water through the coil 2 5m3 h ...

Page 8: ...KOSPEL S A 75 136 Koszalin ul Olchowa 1 tel 48 94 31 70 565 serwis kospel pl www kospel pl ...

Reviews: