background image

7

GB-0

Start-up 

1.  Connect  the  circulating  pump  according  to  the  description  in  „Connection  of 

external appliances”. 

2.  Set the pump mode switch to the „On” position.

3.  Disconnect a room thermostat from RT entry [3]. 

4.  Set the knob [10] at any temperature e.g 50 degress .The boiler will start the 

pump but it will not start the heating. 

5.  Vent the installation and the pump according to the pump manual. 

6.  Check the flow in the installation by the use of some proper devices (e.g rotameter) 

if necessary get rid of the reason of lack of flow. 

7.  Set the knob [10] in the „OFF” position. 

8.  Connect the room thermostat and set the pump mode according to „Connection 

of external appliances”. 

9.  Turn the boiler on. 

Front control panel operation

Control  panel  is  located  on  the  outside 

boiler cover. It consists of (on-off knob,and 

temperature control [10], 4 signalling LED 

indicators [11], [12], [13] green and one 

[14] red. LED indicators are specified on 

page 8. In order to start the boiler, set the 

knob [10] at desire temperature. To switch 

the boiler off, set the knob [10] in „OFF” 

position. Switching off procedure will be 

confirmed by the flashing green indicator 

[11]. At this time the heating elements are 

turned off but the pump will still run for 90 

seconds. After this time the green indica-

tor [11] goes off and the boiler is fully off.

OFF

0

30

40

11

13

10

12

14

Summary of Contents for EKCO.A1

Page 1: ...ELECTRIC CENTRAL HEATING FLOW BOILER EKCO A1...

Page 2: ...for recycling Appropriate utilisation of used product prevents potential negative environmental influences that may occur as a result of inappropriate handling of waste In order to get more detailed...

Page 3: ...must be performed when the power and water supply is cut off 9 Electric installation should be equipped with residual current protective devices and other solutions which will ensure disconnecting th...

Page 4: ...Connect a boiler to the electric mains Boilers of 4 and 6kW are factory pre set to work as single phase boilers If you intend to connect a boiler to the three phase electrical sys tem take off the wi...

Page 5: ...boiler inlet The filter must be installed in horizontal position accordingly to flow direction see arrow on the filter body with the magnetic insert chamber to the bottom Connection to the three phas...

Page 6: ...re in the room is reached In this case the boiler will switch the heating off LED 5 on the controller board signalises the room thermostat status The 5 LED indicator illuminates when the thermostat co...

Page 7: ...ition 8 Connect the room thermostat and set the pump mode according to Connection of external appliances 9 Turn the boiler on Front control panel operation Control panel is located on the outside boil...

Page 8: ...t sends heating signal light off light off light off light on A failure no water in the boiler light off flashing light off light on A failure of the temperature sensor If you can start the boiler up...

Page 9: ...Voltage 400V 3N Rated current A 3 x 17 3 3 x 21 7 3 x 26 0 3 x 30 3 Fuse rated current A 20 25 32 40 Min connecting wires section mm2 5 x 2 5 5 x 4 Max connecting wires section mm2 5 x 16 Rated power...

Page 10: ...10...

Page 11: ......

Page 12: ...KOSPEL S A ul Olchowa 1 75 136 Koszalin tel 48 94 346 38 08 info kospel pl www kospel pl...

Reviews: