1.  Read and strictly follow the installation and operating instructions to ensure a 

long life and reliable boiler operation.

2.  An efficient electrical installation which has been completed in accordance with 

the binding norms of electric installation. 

3.  A wet central heating system equipped with appropriate expansion vessel made 

according to the binding norms of hydraulic installation. 

4.  A wet central heating system must be flushed before boiler installation. 

5.  Do not install any barrier fittings (e.g. valves) on the outlet of the safety valve.

6.  Boiler must not be installed in a humid place or in a place exposed to the danger 

of explosion.  

7.  Boiler installation and all electrical and hydraulic work must be performed by a 

qualified professional installer only. 

8.  All installation work must be performed when the power and water supply is cut 

off. 

9.  Electric installation should be equipped with residual current protective devices 

and other solutions which will ensure disconnecting the heater from the source 

of power (intervals between all their poles should not be less than 3 mm). 

10.  Do not cut off the power supply between the heating seasons. Despite the knob is 

set in „OFF” position, the boiler will start the pump every 24 hours for 90 seconds 

to protect the installation.

11.  Do not drain the water from central heating system after the heating season. 

12.  Before the heating season boiler should be checked by the service point.

This  appliance  is  not  intended  for  use  by  persons  (including  children)  with  reduced 

physical, sensory or mental capabilities or lack of experience and knowledge, unless they 

have been given supervision or instruction concerning use of the appliance by a person 

responsible for their safety. 

Children should be supervised to ensure that they do not play with the appliance.

Summary of Contents for EKCO.A1

Page 1: ...ELECTRIC CENTRAL HEATING FLOW BOILER EKCO A1...

Page 2: ...for recycling Appropriate utilisation of used product prevents potential negative environmental influences that may occur as a result of inappropriate handling of waste In order to get more detailed...

Page 3: ...must be performed when the power and water supply is cut off 9 Electric installation should be equipped with residual current protective devices and other solutions which will ensure disconnecting th...

Page 4: ...Connect a boiler to the electric mains Boilers of 4 and 6kW are factory pre set to work as single phase boilers If you intend to connect a boiler to the three phase electrical sys tem take off the wi...

Page 5: ...boiler inlet The filter must be installed in horizontal position accordingly to flow direction see arrow on the filter body with the magnetic insert chamber to the bottom Connection to the three phas...

Page 6: ...re in the room is reached In this case the boiler will switch the heating off LED 5 on the controller board signalises the room thermostat status The 5 LED indicator illuminates when the thermostat co...

Page 7: ...ition 8 Connect the room thermostat and set the pump mode according to Connection of external appliances 9 Turn the boiler on Front control panel operation Control panel is located on the outside boil...

Page 8: ...t sends heating signal light off light off light off light on A failure no water in the boiler light off flashing light off light on A failure of the temperature sensor If you can start the boiler up...

Page 9: ...Voltage 400V 3N Rated current A 3 x 17 3 3 x 21 7 3 x 26 0 3 x 30 3 Fuse rated current A 20 25 32 40 Min connecting wires section mm2 5 x 2 5 5 x 4 Max connecting wires section mm2 5 x 16 Rated power...

Page 10: ...10...

Page 11: ......

Page 12: ...KOSPEL S A ul Olchowa 1 75 136 Koszalin tel 48 94 346 38 08 info kospel pl www kospel pl...

Reviews: