
KISS
Oil & Gas
2U User’s Manual
www.kontron.com
Fig. 327: Installing telescopic rail sets
Short brackets are generally used at the front of the frame and long brackets at the back.
11.1.1.
Installing the Device in an Industrial Cabinet (using Slide Rails)
1.
Ensure that the sides of the KISS
Oil & Gas
2U chassis are parallel and square to the industrial cabinet.
2.
Use the installation kits and brackets to attach the brackets to the telescopic rails. Loosely tighten the
rear bracket.
3.
Install the telescopic rails in the industrial cabinets.
4.
Attach the inner section of the telescopic rails to the KISS
Oil & Gas
2U chassis.
5.
Place the KISS
Oil & Gas
2U in the industrial cabinet.
6.
Check that the equipment moves evenly and smoothly.
7.
Should it snag or should the rail movement be unsatisfactory:
»
»
»
»
Loosen the screws on the rear installation brackets and adjust the brackets.
Loosen the screws on the KISS
Oil & Gas
2U chassis.
Move the unit back and forward several times.
When the movement has improved, tighten the screws and move the unit the unit back
and forward again.
45