Kone ReSolve 200 Installation Instructions Manual Download Page 6

KONE ReSolve 200

Installation Instruction

6 (258)

AM-10.65.001

(D) 2013-04-17

© 2009 KONE Corporation

All rights reserved.

14.18 Wiring of close command door operator . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  189

14.19 Wiring of FIAM B/S door operator . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  191

14.20 Wiring of Sabiem C door operator. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  193

14.21 Wiring of ACC 230V door operator . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  195

14.22 Wiring of general 24V electronic control door operator . . . . . . . . . . . . . . . . . . . . . .  197

14.23 Wiring of Selcom 1PH 220V automatic door operator. . . . . . . . . . . . . . . . . . . . . . .  199

14.24 Wiring of no car door, EMO N, AT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  201

14.25 Wiring of BOF unit for non-automatic doors  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  202

14.26 Wiring of new COP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  203

14.27 Wiring of old COP and display (if any, parallel I/O module). . . . . . . . . . . . . . . . . . .  204

14.28 Connection of ACU, if applicable. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  207

14.29 Connection of KRM, KSS ReVive signalization. . . . . . . . . . . . . . . . . . . . . . . . . . . .  208

14.30 Connection of KRM, parallel signalization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  208

14.31 Wiring of car extension door (CED). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  209

15

FULL SPEED ADJUSTMENT / COMMISSIONING / SAFETY INSPECTIONS   . . . . . . . .  210

15.1

Balancing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .211

15.2

Selecting roll call type . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  212

15.3

Selecting LWD type . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  212

15.4

Shaft setup  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  213

15.5

Connecting FRD / FID (optional) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  215

15.6

Adjusting motor no load current  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  215

15.7

Checking creeping time. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  215

15.8

Motor slip compensation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  216

15.9

Floor level adjustment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  217

15.10 Final steps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 219

15.11 External options. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  219

15.12 Commissioning of the car door . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  221

15.13 Check the parameters for door inverter. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  223

15.14 Checking KCE board versions  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  224

15.15 Testing landing door locks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  225

15.16 Testing safety contacts  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  225

15.17 Measuring insulation resistance  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  225

15.18 Measuring earth continuity  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  226

15.19 24 VDC ground fault test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  230

15.20 Testing operation of RCD  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  231

15.21 Speed measurement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  231

15.22 Current measurement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  232

15.23 Testing the final limit switches . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  232

15.24 Drive time supervision (DTS) test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  233

15.25  Buffer tests   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 234

15.26 Overspeed governor test. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  236

15.27 Safety gear test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  237

Summary of Contents for ReSolve 200

Page 1: ...tion 1 258 AM 10 65 001 D 2013 04 17 2009 KONE Corporation All rights reserved KONE ReSolve 200 AM 10 65 001 2009 KONE Corporation All rights reserved D 2013 04 17 KONE RESOLVE 200 SINGLE FLEXIBLE MAN...

Page 2: ...product design specifications and procedures reflected in this document NO STATEMENT CONTAINED IN THIS DOCUMENT IS TO BE CONSTRUED AS A WARRANTY OR CONDITION EXPRESS OR IMPLIED AS TO ANY PRODUCT SPEC...

Page 3: ...OOLS 19 Site requirements 19 Tools 20 Ride comfort measurements 22 1 RECEIPT AND CONTROL OF MATERIAL 23 1 1 Checking of packages 24 1 2 Transporting materials 24 1 3 Unloading materials 27 2 PREPARATI...

Page 4: ...ing of wiring between controller panel and machinery 64 6 4 Snelis devices 64 6 5 Specific routing for V3 F motor supply cable 65 6 6 Connecting the extension tool 66 6 7 Connecting travelling cable 6...

Page 5: ...ING DOORS LOCKS AND BUTTONS 131 12 1 Positioning of the car 132 12 2 Connection of landing door lock serial 133 12 3 Wiring of landing call buttons serial 135 12 4 Connection of landing door lock para...

Page 6: ...ion door CED 209 15 FULL SPEED ADJUSTMENT COMMISSIONING SAFETY INSPECTIONS 210 15 1 Balancing 211 15 2 Selecting roll call type 212 15 3 Selecting LWD type 212 15 4 Shaft setup 213 15 5 Connecting FRD...

Page 7: ...HANDOVER TO MAINTENANCE 242 17 1 Prerequisites 242 17 2 Handover form 242 17 3 Autocontrol form 244 17 4 Ride comfort 244 17 5 Installation quality checks 244 18 APPROVALS AND VERSION HISTORY 249 APPE...

Page 8: ...rt cuts of the method Do the installation in the same order as described in the instruction that you get for each job Validity This instruction is valid for installations of elevators with KCE electri...

Page 9: ...ted documents For more information see AM 01 03 001 Take 5 Electrical safety when working on elevators AM 01 03 010 Safe working in elevator shaft and machine room areas AM 01 01 085 Planning guide an...

Page 10: ...ter s 1 Receipt and control of material two fitters for transportation of new material 2 Preparations OR 3 Installing travelling cables 4 Dismantling old machine room equipment 5 Installing and wiring...

Page 11: ...her means Serious injury or death may still be sustained after a fall wearing a harness in an enclosed space AM 01 03 002 Take 5 Electrical safety when working on elevators AM 01 03 003 Take 2 Double...

Page 12: ...effective grounding to prevent shock to personnel and to ensure that protective fuses operate particularly where protection is provided using residual current device RCD When using a portable electri...

Page 13: ...en unoccupied by authorised personnel Cover any unused holes in the machine room floor with steel plates Install temporary screens in common elevator shafts and machine rooms where adjacent elevators...

Page 14: ...it the minus of 24Vdc circuit shall be connected protective earth PE Connection to protective earth is made with connection of KCECPU PE terminal to control panel PE The minus of 24Vdc circuit shall n...

Page 15: ...injury or death during a fall Requirements Always use the harness attached to an approved fixing point when there is a risk of falling and you are working 1 8 m or more above a lower level Refer to AM...

Page 16: ...to the public at all times Keep the area outside the working area clean Store materials in designated storage areas Not on landings or in working area In residential buildings keep to the agreed dail...

Page 17: ...cal safety regulations must be considered Dimensions and rules in this instruction fulfil requirements set in EN 81 1 If local requirements are at a higher level than described in this chapter then th...

Page 18: ...s 100 mm to 299 mm fix the kick plate 3 If the gap is 300 mm to 850 mm use at least 0 7 m high balustrade 4 If the gap is larger than 850 mm use a 1 1 m high balustrade If the clearance between the ba...

Page 19: ...must be planned Transportation routes transportation loadings and lifting point loadings must be planned Suitable secure material storage areas must be agreed with building owner adjacent to the eleva...

Page 20: ...tance meter Handheld tachometer Electric drill Portable crane Extension tool KM796238G10050 for landing doors Pull rope minimum length Elevator shaft height 5 m KONE MiniConsole NOTE These tools can b...

Reviews: