UAB AMALVA we reserve the right to make changes without prior notice.
35
RECU 1200HE - R*
RECU 1200HW - R*
6
2
9
7
5
4
D
A
C
B
2
5
3
6
4
7
9
D
A
C
B
11
11
3
12
RECU 3000/4000/4500/7000HE/HW - R*
2
8
4
10
7
9
D
A
6 11
3 5
C
B
6
2
10
3
7
9
8
5
4
D
A
C
B
11
6
2
10
3
12
12
7
9
8
5
4
D
A
C
B
11
RECU 1600/2000HE - R*
RECU 1600/2000HW - R*
OTK
12
* R – right inspection side.
* L – left inspection side is mirror view of the right.
** Ducted water heater.
1. Rotary heat exchanger
2. Plate heat exchanger
3. Electric or water air heater
4. Supply air filter
5. Exhaust air filter
6. Supply fan
7. Exhaust fan
8. Air by-pass damper
9. Condensate drain
(the water trap must be installed D = 28 mm)
10. Drop eliminator
11. Connection of main cable
12. Fluid connection tube
Outdoor intake
Supply air
Extract indoor
Exhaust air
C
B
A
D
3. INSTALLATION
3.1. Maintenance space requirements
It is recommended to install the air handling unit in a separate room or in the attic on a hard smooth surface insu-
lated with a rubber mat. The place for the unit should be selected with allowance for minimum access to the unit
for maintenance and service inspection. The minimum free space in front of the control panel should be not less
than 700 mm. The free space over the top of the unit should be at least 300 mm (3.1.1 a, b Picture).
Rubber mat must be used when unit is going to be mounted on the wall.
3
6
4
A
B
Summary of Contents for KOMPAKT OTK Series
Page 2: ......