PRECAUTIONS TO BE TAKEN DURING WORK
40
3 - MOVE THE LOAD AWAY IN HORIZONTAL DIRECTION
One arm outstretched and hand in vertical position with
the palm facing towards the load to be moved away: move
the hand in the direction of the movement to be carried
out.
4 - BRING THE LOAD NEARER IN HORIZONTAL DIREC-
TION
One arm outstretched and hand in vertical position with
the palm facing towards yourself: move the hand in the di-
rection of the movement to be carried out.
5 - LIFT THE BOOM
One arm laterally outstretched in horizontal position and
clenched fingers: point the thumb upwards.
6 - LOWER THE BOOM
One arm laterally outstretched in horizontal position and
clenched fingers: point the thumb downwards.
7 - SWING THE BOOM
One arm laterally outstretched in horizontal position: point
the forefinger towards the desired swing direction.
8 - SWING THE BOOM
One arm laterally outstretched in horizontal position: point
the forefinger towards the desired swing direction.
RKA15160
RKA15170
RKA15180
RKA15190
RKA15200
RKA15210
Summary of Contents for F50003
Page 2: ......
Page 21: ...SAFETY AND ACCIDENT PREVENTION 19 ...
Page 23: ...SAFETY NOISE AND VIBRATION PLATES 21 SW L 1000 kg RKA13490 42N 93 11320 RKAB4740 42N 93 11310 ...
Page 64: ...62 THIS PAGE WAS INTENTIONALLY LEFT EMPTY ...
Page 65: ...THE MACHINE AND ITS OPERATIONS 63 ...
Page 166: ...164 THIS PAGE WAS INTENTIONALLY LEFT EMPTY ...
Page 167: ...MAINTENANCE 165 ...
Page 235: ...TECHNICAL SPECIFICATIONS 233 ...
Page 241: ...TECHNICAL DATA 239 5 1 3 3 LIFTING CAPACITIES TELESCOPIC ARM ...
Page 242: ...240 THIS PAGE WAS INTENTIONALLY LEFT EMPTY ...
Page 243: ...AUTHORISED OPTIONAL EQUIPMENT 241 ...
Page 283: ......
Page 284: ... 2005 KOMATSU UTILITY EUROPE S p A All Rights Reserved Printed in Europe ...