116627-2-
AC
2000 Kohler Co.
REVIVAL
VITREOUS CHINA
REVERSE TRAP TOILET
BEFORE YOU BEGIN
HOW TO USE THESE INSTRUCTIONS
Please read these instructions carefully to familiarize
yourself with the required tools, materials, and
installation sequences. Follow the sections that pertain
to your particular installation. This will help you avoid
costly mistakes. In addition to proper installation, read
all operating and safety instructions.
All information in these instructions is based upon the
latest product information available at the time of
publication. Kohler Co. reserves the right to make
changes in product characteristics, packaging, or
availability at any time without notice.
These instructions contain important care, cleaning,
and warranty information – please leave instructions
for the consumer.
NOTES
Observe all local plumbing and building codes.
Shut off the water supply.
Ensure that the new toilet has the correct
roughing-in dimension of 12”. See Fig. #3.
Be very careful while working with vitreous china
products. Vitreous china can break or chip if the
bolts and nuts are overtightened, or if carelessly
handled.
Carefully inspect the new fixture for any sign of
damage.
Fixture dimensions are nominal and conform to
tolerances established by ANSI Standards
(A112.19.2).
For new construction, refer to the dimensions in
Fig. #3 for locating the supply shut-off valve.
Provide adequate trip lever clearance if shelving
or other structures are to be installed above the
toilet tank.
TOOLS AND MATERIALS REQUIRED
10” adjustable wrench
12” pipe wrench
Metal file (file cut)
Tape measure
Tubing cutter
Level
Hacksaw
Putty knife
Screwdriver
Toilet gasket (wax seal)
Toilet T-bolts (2), 5/16” diameter
Toilet setting compound (optional)
Toilet supply shut-off valve, 3/8” recommended
NOTICE: If the existing toilet does not have a supply
shut-off valve below the tank, install one before installing
the new toilet.