background image

116627-2-

AC

2000 Kohler Co.

REVIVAL

VITREOUS CHINA

REVERSE TRAP TOILET

BEFORE YOU BEGIN

HOW TO USE THESE INSTRUCTIONS

Please read these instructions carefully to familiarize
yourself with the required tools, materials, and
installation sequences. Follow the sections that pertain
to your particular installation. This will help you avoid
costly mistakes. In addition to proper installation, read
all operating and safety instructions.

All information in these instructions is based upon the
latest product information available at the time of
publication. Kohler Co. reserves the right to make
changes in product characteristics, packaging, or
availability at any time without notice.

These instructions contain important care, cleaning,
and warranty information – please leave instructions
for the consumer
.

NOTES

Observe all local plumbing and building codes.

Shut off the water supply.

Ensure that the new toilet has the correct
roughing-in dimension of 12”. See Fig. #3.

Be very careful while working with vitreous china
products. Vitreous china can break or chip if the
bolts and nuts are overtightened, or if carelessly
handled.

Carefully inspect the new fixture for any sign of
damage.

Fixture dimensions are nominal and conform to
tolerances established by ANSI Standards
(A112.19.2).

For new construction, refer to the dimensions in
Fig. #3 for locating the supply shut-off valve.

Provide adequate trip lever clearance if shelving
or other structures are to be installed above the
toilet tank.

TOOLS AND MATERIALS REQUIRED

10” adjustable wrench

12” pipe wrench

Metal file (file cut)

Tape measure

Tubing cutter

Level

Hacksaw

Putty knife

Screwdriver

Toilet gasket (wax seal)

Toilet T-bolts (2), 5/16” diameter

Toilet setting compound (optional)

Toilet supply shut-off valve, 3/8” recommended

NOTICE: If the existing toilet does not have a supply
shut-off valve below the tank, install one before installing
the new toilet.

Summary of Contents for REVIVAL

Page 1: ... codes Shut off the water supply Ensure that the new toilet has the correct roughing in dimension of 12 See Fig 3 Be very careful while working with vitreous china products Vitreous china can break or chip if the bolts and nuts are overtightened or if carelessly handled Carefully inspect the new fixture for any sign of damage Fixture dimensions are nominal and conform to tolerances established by ...

Page 2: ... If the new toilet is not installed immediately temporarily stuff a rag into the closet flange Fig 1 Closet Flange Install two new 5 16 diameter T bolts into the closet flange Fig 2 T Bolts Closet Flange TO INSTALL SUPPLY SHUT OFF VALVE Install the supply shut off valve so it is 9 above the finished floor line and 4 1 8 to the left of the closet flange centerline The centerline of the supply shut ...

Page 3: ...ble the bolt cap bases washers and nuts on the exposed T bolts Hand tighten the nuts then tighten them an additional 1 2 turn CAUTION Risk of personal injury or product damage Overtightening may cause breakage or chipping of the vitreous china If the T bolts extend more than 1 4 over the top of the nuts cut off the excess and file the end Wipe away any residue Install the bolt caps Fig 5 Nut Washe...

Page 4: ...the coupling nut and then tighten the compression nut Fig 7 Tubing Ferrule Supply Shank Seal Washer Coupling Nut Compression Nut Supply Shut Off Valve Compression Washer Tubing Coupling Nut Compression Nut Ferrule Open the supply shut off valve and check all connections for leakage If the connections have been properly assembled a slight retightening of the nuts should stop any leakage If the toil...

Page 5: ... China Tab Cover Bracket Carefully lift the front of the tank cover just enough to gain access to the flapper chain and lift rod Insert the flapper chain S hook into the middle hole in the lift rod Set the tank cover onto the tank Be sure the cover bracket and vitreous china tab are engaged Test flush the toilet several times to ensure proper operation If the flapper ball does not seat properly wh...

Page 6: ...ff a few times Clean float valve seal surface located under float valve cap Replace float valve cap assembly by engaging lugs and rotating 1 8 turn clockwise Turn water on Install filter in supply line to prevent recurring problems B Replace seal 3 Incorrect water level height A Valve float cup does not contain enough water to provide required ballast A During fill cycle hold float under water a f...

Page 7: ...ervice through either your contractor or Kohler Co distributor please write us directly at Kohler Co Attn Customer Service Department 444 Highland Drive Kohler WI 53044 USA or by calling 1 800 4 KOHLER from within the USA FOURTH Include all pertinent information regarding your claim including a complete description of the product model numbers colors finishes and the date the product was installed...

Page 8: ... 8 116627 2 AC Kohler Co Kohler WI ...

Reviews: