background image

7

INSTALL THE GRIP RAIL

INSTALL THE GRIP RAIL

For baths with K-8645-CP.

Place the gasket (6) onto the grip rail(7). Make sure the

gasket is matching the contour of the grip rail. Position

the grip rail with gasket so that the hole lines up with

the hole on the nut pre-installed on the side of bath tub.

Note: the smaller side of the grip rail is on the drain

side of the tub.

Thread the screw (8) into the hole of the grip rail.

Tighten the screw snugly to secure the grip rail. Snap

the cap (9) into each hole.

Repeat above procedures for the other grip rail.

K-8645-CP

(6)

(7)

(8)

(9)

COMPLETE FINISH WALL

COMPLETE FINISH WALL

CAUTION: Risk of product damage.

Do not support

the weight of the bath by the rim.

Install the ceramic or marble tiles. Seal the joints

between the bath rim and the finished tiled wall using

silicone sealant. RTV (Room Temperature Vulcanizing)

sealant is recommended.

Apply a bead of silicone sealant over the seam

between the bath apron and the finish floor.

!!

(

)

7

6

6

8

9

8

Finished Tiled Wall

Paste Mortar

Brick or Concrete Wall

Framing Construction

Bath

Silicone Filler

116867-T01-B

Summary of Contents for PRELUDE K-8266T

Page 1: ...me of publication Kohler China Ltd reserves the right to make changes in product characteristics packaging or availability at any time without notice These instructions contain important care cleaning...

Page 2: ...ole location in the flooring B 110 118mm C Accessory Information Grip Rail K 8645 CP C K 8645 CP INSTALLATION REQUIREMENTS INSTALLATION REQUIREMENTS B Materials Required Plumbers putty Wall coverings...

Page 3: ...the enamel finish must be followed WARNING Failure to follow the manufacturer s recommended installation method may result in damage to the enamel surface Do not use sharp objects or metal tools when...

Page 4: ...e floor for the drain connection A2 1 152 305mm A1 Installation of Bath with Adjustable Hlight Slide the new bath into position Insert the drain tailpiece into the trap Level the bath by positioning m...

Page 5: ...b to support the weight of the tub until the mortar hardens Wedges will remain in the mortar Frequently check the level of the tub 25 30 NOTE B Install Plumbing CAUTION Risk of damage to bath bottom a...

Page 6: ...ut a ledge is desired the finished apron wall surface must be 2 mm under the bath rim 1 Corner Installation The suggested framing construction is illustrated 1 2 Recess Installation The suggested fram...

Page 7: ...gly to secure the grip rail Snap the cap 9 into each hole Repeat above procedures for the other grip rail K 8645 CP 6 7 8 9 COMPLETE FINISH WALL COMPLETE FINISH WALL CAUTION Risk of product damage Do...

Page 8: ...pH 3 8 Housekeeping Responsibilities The Safeguard slip resistant surface on this bathtub meets or exceeds the requirements of ASME ANSI slip resistance Improper maintenance or cleansers may permanent...

Page 9: ...after purchase Implied warranties including that of merchantability and fitness for a particular purpose are expressly limited in duration to the duration of this warranty Kohler China disclaims any...

Reviews: