background image

6

C.

2mm

C. Finish Bath Area Construction

NOTE:

An access panel is essential for future

maintenance.

Possible framing arrangements are illustrated below.

Use the framing construction appropriate for your

particular bath model. Some modifications may be

needed for other types of construction, if preferred.

If an apron wall without a ledge is desired, the finished

apron wall surface must be 2 mm under the bath rim.

1). Corner Installation

The suggested framing construction is illustrated.

1).

2). Recess Installation

The suggested framing construction is illustrated.

2).

Recommended For Drop-in Models

3). Peninsular Installation

The suggested framing construction is illustrated.

3).

Finished Wall

Wall

Framing

Construction

Service Access

Finished Wall

Wall

Framing

Construction

Service Access

Finished Wall

Wall

Framing

Construction

Service Access

116867-T01-B

Summary of Contents for PRELUDE K-8266T

Page 1: ...me of publication Kohler China Ltd reserves the right to make changes in product characteristics packaging or availability at any time without notice These instructions contain important care cleaning...

Page 2: ...ole location in the flooring B 110 118mm C Accessory Information Grip Rail K 8645 CP C K 8645 CP INSTALLATION REQUIREMENTS INSTALLATION REQUIREMENTS B Materials Required Plumbers putty Wall coverings...

Page 3: ...the enamel finish must be followed WARNING Failure to follow the manufacturer s recommended installation method may result in damage to the enamel surface Do not use sharp objects or metal tools when...

Page 4: ...e floor for the drain connection A2 1 152 305mm A1 Installation of Bath with Adjustable Hlight Slide the new bath into position Insert the drain tailpiece into the trap Level the bath by positioning m...

Page 5: ...b to support the weight of the tub until the mortar hardens Wedges will remain in the mortar Frequently check the level of the tub 25 30 NOTE B Install Plumbing CAUTION Risk of damage to bath bottom a...

Page 6: ...ut a ledge is desired the finished apron wall surface must be 2 mm under the bath rim 1 Corner Installation The suggested framing construction is illustrated 1 2 Recess Installation The suggested fram...

Page 7: ...gly to secure the grip rail Snap the cap 9 into each hole Repeat above procedures for the other grip rail K 8645 CP 6 7 8 9 COMPLETE FINISH WALL COMPLETE FINISH WALL CAUTION Risk of product damage Do...

Page 8: ...pH 3 8 Housekeeping Responsibilities The Safeguard slip resistant surface on this bathtub meets or exceeds the requirements of ASME ANSI slip resistance Improper maintenance or cleansers may permanent...

Page 9: ...after purchase Implied warranties including that of merchantability and fitness for a particular purpose are expressly limited in duration to the duration of this warranty Kohler China disclaims any...

Reviews: