background image

D.

1500MM ........................1462 662mm

1600MM ........................1562 662mm

1700MM ........................1662 662mm

1400MM ........................1362 662mm

D. CUT-OUT Dimensions

PRELUDE 1500MM......................1462 662mm

1600MM......................1562 662mm

1700MM......................1662 662mm

QUIETUDE 1400MM......................1362 662mm

ROUGHING-IN

A. Roughing-in Note

Fixture dimensions are nominal and conform to

tolerances in ASME/ANSI Standard A112.19.1M.

A.

/

A112.19.1M

B. Determine Roughing-in

Measure the height, width, and depth of the bath. Verify

these dimensions with those on this page.

Allow clearance at the drain hole location in the flooring.

B.

*

110-118mm

C. Accessory Information

Grip Rail...................................................K-8645-CP

C.

.........................................................K-8645-CP

INSTALLATION REQUIREMENTS

INSTALLATION REQUIREMENTS

B. Materials Required

Plumbers putty

Wall coverings, as

necessary

Silicone sealant

Protective covering for

bathtub or card board

Metal shims

!
!

!
!

!

A. Tools Required

!

!
!
!
!
!
!

Adjustable pipe

wrench

Rule

Level

Safety shoes

Safety glasses

Square

Pliers

A.

!

!
!
!
!
!
!

B.

(

)

(

)

!
!

!
!

!

700

350

B

A

L

64

C

20

2

* The with of bath front rim is 110-118mm, Please

select the faucet with matching spout for the bath.

UNIT: mm

:

89Kg

92Kg

L

B

A

1500

1400

294 117

69

246

86Kg

1600

294 117

93Kg

1700

294 117

K-8266T/7/8/9

K-8270T/1

C

K-8273T/5
K-8262T/3

435
435
435
443

116867-T01-B

Summary of Contents for PRELUDE K-8266T

Page 1: ...me of publication Kohler China Ltd reserves the right to make changes in product characteristics packaging or availability at any time without notice These instructions contain important care cleaning...

Page 2: ...ole location in the flooring B 110 118mm C Accessory Information Grip Rail K 8645 CP C K 8645 CP INSTALLATION REQUIREMENTS INSTALLATION REQUIREMENTS B Materials Required Plumbers putty Wall coverings...

Page 3: ...the enamel finish must be followed WARNING Failure to follow the manufacturer s recommended installation method may result in damage to the enamel surface Do not use sharp objects or metal tools when...

Page 4: ...e floor for the drain connection A2 1 152 305mm A1 Installation of Bath with Adjustable Hlight Slide the new bath into position Insert the drain tailpiece into the trap Level the bath by positioning m...

Page 5: ...b to support the weight of the tub until the mortar hardens Wedges will remain in the mortar Frequently check the level of the tub 25 30 NOTE B Install Plumbing CAUTION Risk of damage to bath bottom a...

Page 6: ...ut a ledge is desired the finished apron wall surface must be 2 mm under the bath rim 1 Corner Installation The suggested framing construction is illustrated 1 2 Recess Installation The suggested fram...

Page 7: ...gly to secure the grip rail Snap the cap 9 into each hole Repeat above procedures for the other grip rail K 8645 CP 6 7 8 9 COMPLETE FINISH WALL COMPLETE FINISH WALL CAUTION Risk of product damage Do...

Page 8: ...pH 3 8 Housekeeping Responsibilities The Safeguard slip resistant surface on this bathtub meets or exceeds the requirements of ASME ANSI slip resistance Improper maintenance or cleansers may permanent...

Page 9: ...after purchase Implied warranties including that of merchantability and fitness for a particular purpose are expressly limited in duration to the duration of this warranty Kohler China disclaims any...

Reviews: