background image

8

1128227-A01-D   Date: 13/8/2010 

D.

 

IMPORTANT

: Bath must be installed level on all top 

edges.

E.

 Install the drain to the bath according to the drain manufacturer’s instructions. Do not connect the trap at this time.  

If a pop up waste/overflow has been selected as an accessory, then an extra overflow hole might require drilling.

The position of the overflow holes are shown on page 2.  (Refer to part ‘M’ in the next section for cutting and drilling 

instructions) 

C.

 Identify suitable blower installation and access positions

     before proceeding with installation.  A suitable power 

     outlet will also be required within 610mm of the blower.

     See section H.

NOTE: NO MOTOR ACCESS NO WARRANTY 

SERVICE.

 Ventilation must be provided in order to 

allow heat from motor to dissipate.

.

Blower Access*

Blower Access*

Blower Access*

INSTALL THE BATH

CAUTION: Risk of product damage.

 Do not lift 

the bath with airjets by the air channels or blower 

motors, or use the air channels or blower motor 

for structural support of the bath.

CAUTION: Risk of product damage.

 Do not 

support the bath by the rim.

as necessary.

A. Option Using a Cement or Mortar Bed 

NOTE:

 Do not use gypsum cement or drywall 

compound for this application, as they will not provide 

an acceptable, durable bond. 

•  Spread a 50mm thick layer of cement or mortar on 

secure, level, and support the unit. Clear all the  

material away from the support block locations.

•  Position a piece of plastic drop cloth material on top 

of the cement or mortar bed.

•  With help, carefully lift the bath into place, and 

make sure the support blocks do not rest in the bed 

Material. 

•  Insert the drain tailpiece into the trap. Make sure the 

bath is level and resting on all support blocks.

•  Remove the protective tape from the rim. 

Spread a 50mm Layer

of Cement or Mortar

Bed Material.

Clear spaces

for support blocks.

�����������������������������������������������

�����������������������������������������������������������������������������������������������������

Summary of Contents for OVE RECT drop in 1709A-GAB-0

Page 1: ...10 A 50Hz C Installation Read the entire installation instructions before beginning the installation BEFORE YOU BEGIN BUBBLE MASSAGE BATH INSTALLATION INSTRUCTIONS 1128227 A01 D Date 13 8 2010 Blower...

Page 2: ...2 REGATTA BUBBLE MASSAGE 11303A GAB 0 1128227 A01 D Date 13 8 2010 OVE BUBBLE MASSAGE 1709A GAB 0 50...

Page 3: ...3 1128227 A01 D Date 13 8 2010 EVOK BUBBLE MASSAGE 18263A GAB 0 EVOK RECT FREESTANDING BUBBLE MASSAGE 18344A GAB 0 50 837 5 1675 762 408 5 50 36 513 610 81...

Page 4: ...4 1128227 A01 D Date 13 8 2010 EVOK OVAL BUBBLE MASSAGE 18346A GAB 0 EVOK OVAL FREESTANDING BUBBLE MASSAGE 18348A GAB 0 398 750 50 1700 850 39 50 510 610 398 750 50 1700 850 50 530...

Page 5: ...5 ESCALE DROP IN BUBBLE MASSAGE BATH 11343A GAB 0 1128227 A01 D Date 13 8 2010 ESCALE FREESTANDING BUBBLE MASSAGE BATH 11344A GAB 0...

Page 6: ...or property damage Please read all instructions thoroughly before beginning installation including the following Product Requirements WARNING Keep the area around the blower motor clean and free of de...

Page 7: ...g Install an access panel to allow the pump to be serviced Bath may be installed next to the Bath rim must be fully supported wall or as an island installation Tile Brick or timber B Whirlpool Area Co...

Page 8: ...TALL THE BATH CAUTION Risk of product damage Do not lift the bath with airjets by the air channels or blower motors or use the air channels or blower motor for structural support of the bath CAUTION R...

Page 9: ...ion Insert the drain tailpiece into the trap Make sure the bath is level and resting on all support blocks Remove the protective tape from the rim Apply a continuous bead of high quality silicone seal...

Page 10: ...d with a cord and plug A licensed electrician must install a dedicated GFCI protected 220V 10A grounded outlet Locate the outlet behind the bath and within 610mm of the blower motor Plug the blower mo...

Page 11: ...im is fully supported Build the bath support frame as shown When the bath is securely positioned before the unit is fully built in install tapware connect plumbing to Run water into the bath and check...

Page 12: ...Do not use powdered cleaners unless the cleaner is fully dissolved in water Solid substances could block the airjets Do not use bleach or ammonia cleaning solutions Chemically active cleaning solution...

Page 13: ...move air switch tube and drain C Air switch is faulty or disconnected C Check air tube connections D Blower motor does not work D Replace blower motor 2 Blower motor starts but there are few or no bub...

Page 14: ...information please visit our website Australia www au kohler com New Zealand www kohler co nz CONTACT AND WARRANTY INFORMATION 1034122 FJ Check Valve Air switch and blower 1128A CP 1122542 80mm Level...

Page 15: ......

Reviews: