I. Test Run the Bath with Airjets

•  For information on unit operation, refer to the 

•  Check all electrical connections, and make sure the 

electrical power to the bath with airjets is on.

•  Make sure all piping connections in the air harness are secure. 

•  Verify that the blower motor is secure.

•  Temporarily remove the plastic drop cloth or other 

protective sheeting from the bath.

•  Fill the bath to a level at least 50mm above the top of 

the highest airjet.

•  Check the drain piping for leaks. Repair any leaks.

•  

airjets. Check the air piping for air leaks.

•  Stop the bath and drain the water.

•  Return the plastic drop cloth or other protectivesheeting  

to the bath. Check the drain connections for leakage. 

H. Make Electrical Connections

WARNING: Risk of electric shock.

 To reduce the  

risk of electrical shock, connect the blower motor 

to a properly grounded, grounding-type receptacle 

protected by Ground-Fault Circuit-Interrupters 

(GFCIs). Do not remove the plug grounding pins. 

 Do not use grounding adapters.

NOTE:

 The model number and electrical rating of the blower

is printed on the blower. 
•  The blower is equipped with a cord and plug.  A licensed 

electrician must install a dedicated GFCI-protected, 220V, 10A, 

grounded outlet. Locate the outlet behind the bath, and within 

610mm of the blower motor.  

 

•  Plug the blower motor into this outlet.

•  Clean the area of all dust and debris.

GFCI-Protected Receptacle

Blower Motor

G. Install the Plumbing

CAUTION: Risk of property damage.

 Ensure a 

watertight seal on the bath drain.

• Connect the drain to the trap according to the 

manufacturer’s instructions.

NOTICE:

 An access panel will simplify future maintenance.

•  Install the faucet valving according to the faucet 

manufacturer’s instructions. Do not install the faucet 

trim until instructed. Open the hot and cold water 

supplies, and check the supply connections for 

leakage. 

•  Run water into the bath, and check the drain 

connections for leakage.

F. Install the Blower

     (For Detached Blower Versions Only )

• 

 

Connect the flexible coupling to the blower 

using PVC cement  

• 

 

Once connected find a suitable installation position for 

the blower.

• 

 

Secure the blower firmly using appropriate fixings so 

that the blower can not vibrate free when in use

The detached blower can be installed up to 1.5m from 

the bath if desired.  

Appropriate fixings

through holes in blower

Apply PVC Cement Here

Air blower must be located or fixed so that it cannot 

fall into the bath of spa. 

• 

Summary of Contents for OVE RECT drop in 1709A-GAB-0

Page 1: ...10 A 50Hz C Installation Read the entire installation instructions before beginning the installation BEFORE YOU BEGIN BUBBLE MASSAGE BATH INSTALLATION INSTRUCTIONS 1128227 A01 D Date 13 8 2010 Blower...

Page 2: ...2 REGATTA BUBBLE MASSAGE 11303A GAB 0 1128227 A01 D Date 13 8 2010 OVE BUBBLE MASSAGE 1709A GAB 0 50...

Page 3: ...3 1128227 A01 D Date 13 8 2010 EVOK BUBBLE MASSAGE 18263A GAB 0 EVOK RECT FREESTANDING BUBBLE MASSAGE 18344A GAB 0 50 837 5 1675 762 408 5 50 36 513 610 81...

Page 4: ...4 1128227 A01 D Date 13 8 2010 EVOK OVAL BUBBLE MASSAGE 18346A GAB 0 EVOK OVAL FREESTANDING BUBBLE MASSAGE 18348A GAB 0 398 750 50 1700 850 39 50 510 610 398 750 50 1700 850 50 530...

Page 5: ...5 ESCALE DROP IN BUBBLE MASSAGE BATH 11343A GAB 0 1128227 A01 D Date 13 8 2010 ESCALE FREESTANDING BUBBLE MASSAGE BATH 11344A GAB 0...

Page 6: ...or property damage Please read all instructions thoroughly before beginning installation including the following Product Requirements WARNING Keep the area around the blower motor clean and free of de...

Page 7: ...g Install an access panel to allow the pump to be serviced Bath may be installed next to the Bath rim must be fully supported wall or as an island installation Tile Brick or timber B Whirlpool Area Co...

Page 8: ...TALL THE BATH CAUTION Risk of product damage Do not lift the bath with airjets by the air channels or blower motors or use the air channels or blower motor for structural support of the bath CAUTION R...

Page 9: ...ion Insert the drain tailpiece into the trap Make sure the bath is level and resting on all support blocks Remove the protective tape from the rim Apply a continuous bead of high quality silicone seal...

Page 10: ...d with a cord and plug A licensed electrician must install a dedicated GFCI protected 220V 10A grounded outlet Locate the outlet behind the bath and within 610mm of the blower motor Plug the blower mo...

Page 11: ...im is fully supported Build the bath support frame as shown When the bath is securely positioned before the unit is fully built in install tapware connect plumbing to Run water into the bath and check...

Page 12: ...Do not use powdered cleaners unless the cleaner is fully dissolved in water Solid substances could block the airjets Do not use bleach or ammonia cleaning solutions Chemically active cleaning solution...

Page 13: ...move air switch tube and drain C Air switch is faulty or disconnected C Check air tube connections D Blower motor does not work D Replace blower motor 2 Blower motor starts but there are few or no bub...

Page 14: ...information please visit our website Australia www au kohler com New Zealand www kohler co nz CONTACT AND WARRANTY INFORMATION 1034122 FJ Check Valve Air switch and blower 1128A CP 1122542 80mm Level...

Page 15: ......

Reviews: