1.
Prepare the Site
Flooring
NOTICE:
Adequate floor support must be provided. Consult the roughing-in
information packed with the bath for specific floor loading requirements.
Install adequate floor support.
NOTICE:
To ensure a successful installation, it is critical that bath be installed on a
level subfloor.
Verify the subfloor is level. Adjust for level, if necessary.
Framing
NOTICE:
The bath must be installed into an alcove.
NOTICE:
Take into account the thickness of the finished wall materials when
constructing the framing.
Construct the framing with 2x4 or 2x6 studs according to the roughing-in
information packed with the bath.
Plumbing
NOTE: For through-the-floor drain installations:
A drain hole will need to be cut to
accommodate the drain connections.
For above-the-floor drain installations:
A hole
will not need to be cut.
Position the plumbing according to the roughing-in sheet packed with the bath.
Cap the supplies and check for leaks.
Attach the drain to the bath according to the drain manufacturer’s instructions.
Do not connect the trap at this time.
Place a clean drop cloth on the bottom of the basin area. This will prevent the
surface of the bath from scratching during the installation process.
Verify that the subfloor offers adequate
support, and is flat and level.
Vérifier que le sous-plancher offre un support
adéquat et qu'il soit plat et nivelé.
Verifique que el subpiso proporcione suficiente
soporte y que esté plano y nivelado.
Construct 2x4 or 2x6 stud
framing according to the
roughing-in information.
Construire un cadre de
montant de 2x4 ou de 2x6
suivant l'information du plan
de raccordement.
Construya una estructura de
postes de 2x4 ó 2x6,
conforme al diagrama de
instalación.
Position the rough plumbing.
Positionner la plomberie de
raccordement.
Coloque las tuberías de
plomería.