3. Install the Bath
Stack together two 1.8m supports more than 25mm thick on both sides of the drain pipe to temporarily
support the bath.
With help, use lifting straps to carefully lift the bath into position on the supports so the bath drain is over the
drain pipe.
Carefully reposition the bath as needed so the bath drain is directly over the drain pipe.
Use lifting straps and get additional assistance to remove the supports and carefully set the bath on the floor.
Adjust the bath position as needed to ensure that the drain pipe is in the center of the bath drain hole.
Verify that the bath is level. Install shims (not supplied) as needed.
CAUTION: Risk of personal injury.
This bath is extremely heavy. Obtain sufficient help and use lifting
straps to carefully lift or move the bath.
CAUTION: Risk of property damage.
For baths with factory-installed drains, make sure the connections
have not become loose during shipping. Tighten as needed to prevent leakage.
2. Install the Drain
NOTE:
If your model has a factory-installed drain, go to the "Install the Bath" section.
Place a drop cloth on the floor.
With help, use lifting straps to carefully place the bath on its side.
NOTE:
The gaskets are included in a small box located within the bath carton.
Apply 100% silicone sealant to both sides of the flange gasket and drain gasket to act as a lubricant.
Apply sealant tape to the drain flange threads.
Install the flange gasket, drain flange, drain gasket to the bath. Secure the drain flange with the nut.
CAUTION: Risk of personal injury.
This bath is extremely heavy. Obtain sufficient help and use lifting
straps to carefully lift or move the bath.
Summary of Contents for K-8331T Series
Page 6: ...1329949 T01 B 6 CSA B45 5 IAPMO Z124 1 8m 25mm 1 1 2 PVC 15cm...
Page 8: ...1329949 T01 B 8 3 1 8m 25mm 2...
Page 9: ...9 1329949 T01 B 4 PVC 1 1 2 PVC...
Page 10: ......
Page 11: ......
Page 12: ......