background image

  

1329949-T01-B

1. Prepare the Site

X

1-1/2" Drain Pipe

Dia. 70mm

12mm under floor

Finished Floor

NOTICE:

 Provide adequate floor support.

NOTICE:

 Measure your product for site preparation.

  Determine the location of the bath.

  Make sure that the subfloor offers adequate support for the bath.

  Ensure that the subfloor is level.

IMPORTANT! 

To ensure a successful installation, install the bath on a level finished floor.

  Position and install a standard PVC or brass drain pipe. Install the drain pipe so it extends above the finished 

floor - "X" dimension. Refer to the product specification sheet for the "X" dimension.

Drain Flange

Apply 100% silcone  

sealant to both sides.

Apply 100% silcone  

sealant to both sides.

Flange Gasket

Drain Gasket

Nut

Bath Model

"X" Dimension, above the floor

K-8331T-*

16mm Min – 19mm Max

K-8333T-*

16mm Min – 19mm Max

K-8336T-*

16mm Min – 19mm Max

Reviews: