4. Install the Carriage
Lag Bolts
Align the front of the frame flush or no more than 1/16" (2 mm) behind the face of the studs. If the frame protrudes past
the face of the studs, the wall material can be damaged. If the front of the frame is recessed too far, the bowl will not be
fully supported and may move during use.
Verify that the front of the carriage is plumb.
Mark the hole locations for the six lag bolts, one for each foot and two on each side of the carriage.
Drill pilot holes (remove the carriage if needed) at the marked locations.
NOTE: If the carriage is installed onto a concrete subfloor, use concrete expansion bolts (not supplied) when securing the
feet of the carriage.
Secure the carriage to the support studs using 3/8" x 2" (51 mm) long (minimum) lag bolts (not supplied), one at each
location.
For Installations with a Cleansing Seat
WARNING: Risk of personal injury. Disconnect the electrical power before connecting the wires.
NOTE: Only follow this step if you installed an electrical box in the “Prepare the Carrier” section.
Connect the electrical power according to applicable codes.