1. Preparation
Install the water supplies and drain piping according to the
roughing-in information.
Cut out the template along the inside of the template cutting line.
Position the template on the countertop to ensure clearance
between the lavatory, faucet, and backsplash.
Verify cabinet clearance beneath the countertop.
Use a pencil to trace the template on the countertop.
Mark the faucet and handle centerline on the countertop.
Cut out the opening by carefully following the pencil line traced
from the template
Go to the section that pertains to your style of installation.
Template
Template
Kohler Co.
3
1053432-2-A