3
Kohler Co., Kohler, WI
112363–2–
AA
(0793)
3. INSTALLATION
INSTALL NEW SHUT-OFF VALVE
For supply installation, refer to instructions packed with
supply stop.
Locate supply shut-off valve so it is ”10-1/4 above floorline
and 5-1/8” to the left of the centerline of the closet flange.
Fig. #3
5-1/8”
10-1/4”
12”
Install new 5/16” diameter T-bolts.
Fig. #4
Closet Flange
T-Bolts
INSTALL TOILET GASKET
Place toilet upside down in padding.
Firmly place gasket on toilet outlet. If using a gasket with
integral plastic sleeve, position gasket with sleeve facing
away from toilet.
If desired, place a 1/4”-thick bead of toilet setting com-
pound around base.
NOTE: If a rag or other plug was placed in closet flange,
remove rag from closet flange before setting toilet.
Fig. #5
Gasket
ALIGN AND SET TOILET
Carefully align and lower toilet over the closet flange and
T-bolts.
CAUTION: Risk of external leakage. Do not lift or
rock toilet after placement. A new gasket must be
reapplied if you break the watertight seal.
Apply full body weight to toilet rim to set seal.
Fig. #6