TT-1601 5/16
7
1. Brackets (GM86091 qty. 2), bolts (X-6224-20 qty. 4), and
nuts (X-6210-7 qty. 4)
2. Bulkhead connection panel (GM86346 or GM88918)
GM86016-
1
2
Figure 13
Secure Bulkhead Connection Panel to
Corner Rails
8.
Top Rails and Bracket Installation
GM86016-
1. Rail (GM86078 qty. 2). See Figure 15 for bracket location.
2. Rail (GM86080 or GM86081 qty. 2)
3. Corner (GM86035 qty. 4) and screw (X-67-141 qty. 24)
1
2
3
1
Figure 14
Top Rail and Bracket Installation
8.1 Cut foam (GM87549 or GM88912) to length and
insert into the rails (GM86078 qty. 2 and GM86080
or GM86081 qty. 2). See Figure 15.
8.2 Position the rails (GM86078 qty. 2 and GM86080
or GM86081 qty. 2) as shown in Figure 14.
8.3 Attach the brackets (GM86091 qty. 5) to the
service side rail (GM86080 or GM86081) using
the hardware specified at the locations shown in
Figure 15.
8.4 Attach the brackets (GM86091 qty. 4) using the
hardware specified at the locations shown in
Figure 15.
8.5 Secure the corners (GM86035 qty. 4) to the rails
as shown in Figure 14 using six screws
(X-67-141) per corner.
8.6 Position the corner foam (GM87547 or GM88910)
as shown in Figure 15. Install three foam pieces
per corner.
Summary of Contents for 40EFOZDJ
Page 15: ...TT 1601 5 16 15 Notes ...