
TP-5737 5/01
115
Section 9 Wiring Diagrams
Terminal
Purpose
1
Ground—emergency stop relay (K4)—connect
emergency stop across terminals TB1-1 and
1A *
1A
Emergency stop relay (K4) coil; negative
side—connect emergency stop across
terminals TB1-1 and 1A *
2
Ground terminal
12
Overcrank (OC) signal
[
26
Auxiliary (AUX) signal
[
32
Common fault/prealarm line 1—A/V alarm or
common fault relay activated by OC, 12; AUX,
26; LWT, 35; HET, 36; LOP, 38; OS, 39; AHET,
40; ALOP, 41; and LF, 63 faults
32A
Common fault/prealarm line 2—A/V alarm or
common fault relay activated by AUX, 26;
HET, 36; LOP, 38; OS, 39; and ES, 48 faults
35
Low water temperature (LWT) signal
36
High engine temperature (HET) signal
[
38
Low oil pressure (LOP) signal
[
39
Overspeed (OS) signal
[
40
Anticipatory high engine temperature (AHET)
signal
[
41
Anticipatory low oil pressure (ALOP)
signal
[
42A
Battery voltage (fuse #1 protected)—
accessory power supply; customer may also
provide separate accessory power source
48
Emergency stop (ES) signal
[
56
Air damper (AD) switch, if equipped
60
System ready signal
[
61
Battery charger fault—connect battery charger
alarm contact to TB1-61 to activate fault lamp
(active low), if used
62
Low battery volts—connect battery charger
alarm contact to TB1-62 to activate fault lamp
(active low), if used
63
Low fuel (LF) fault—connect fuel level sensor
to TB1-63 to activate fault lamp (active low), if
used
70C
Generator in cool down mode signal
70R
Generator in running mode signal
80
Not in auto signal
[
* Connect jumper across terminals 1 and 1A if emergency stop
switch is not used.
[
Use a remote annunciator and/or A/V alarm kit as an indicator
with a dry contact kit connected to controller terminal strip TB1.
Note:
Not all terminals are used for all generator sets (see
appropriate wiring diagrams for specific generator set model).
Figure 9-18
Controller TB1 Terminal Strip
(Decision-Maker
t
3+ Controller)
Terminal
Purpose
1P
Prime power operation
2P
Prime power operation
3
Remote start ground—connect transfer
switch or remote start switch to TB2-3 and
TB2-4
3P
Prime power operation
4
Remote start—connect transfer switch or
remote start switch to TB2-3 and TB2-4
4P
Prime power operation
9
Crank mode selection (open: cyclic crank,
ground: continuous crank); connect TB2-9
to TB2-9A for continuous cranking; leave
TB2-9 open cyclic cranking; see starting
instructions in Section 2, Operation.
9A
Crank mode ground
Note:
To use prime power mode—place jumpers across TB2-1P to
TB2-2P, TB2-3P to TB2-4P, and TB2-3 to TB2-4. To deactivate
prime power mode—remove jumpers across TB2-1P to TB2-2P,
TB2-3P to TB2-4P, and TB2-3 to TB2-4.
Figure 9-19
Controller TB2 Terminal Strip
(Decision-Maker
t
3+ Controller)
Summary of Contents for 125EOZ/100EFOZ
Page 6: ......
Page 12: ...TP 5737 5 01 VI Safety Precautions and Instructions Notes...
Page 14: ...TP 5737 5 01 ii Service Assistance Notes...
Page 58: ...TP 5737 5 01 44 Section 5 Decision Makert 3 Troubleshooting Notes...
Page 70: ...TP 5737 5 01 56 Section 6 Decision Makert 1 Controller Troubleshooting Notes...
Page 108: ...TP 5737 5 01 94 Section 8 Disassembly Reassembly Notes...
Page 110: ...TP 5737 5 01 96 Section 9 Wiring Diagrams Notes...
Page 128: ...TP 5737 5 01 Section 9 Wiring Diagrams 114 Notes...
Page 136: ...TP 5737 5 01 122 Section 9 Wiring Diagrams Notes...
Page 145: ......
Page 146: ......
Page 147: ......