
Install the Pump Box (cont.)
Fit the pump box between the false wall and face wall. Locate the pump box to maximize
accessibility and so the pump inlet faces your planned suction line. The pump box must be within
36
″
(91.4 cm) on either side of the tower. Check to ensure that the tower cables will reach the pump.
If they do not, move the pump box closer to the tower. Do not secure the pump box in place at this
time.
1030200-2-B
16
Kohler Co.