HND-R106
page 10
HND-R106 K09/0422
8.5 Start Operation
Turn device on via
key.
After segment test
the device displays some information on its
configuration:
if zero point or slope correction is active
(see chapter 13 Adjustment of temperature input)
After that the device is ready for measuring.