8. Commissioning
The piping MUST be flushed of debris before installation. Debris such as slag
from welding, grinding dust, rust, pipe tape or sealing compound are common
within new piping installations and will damage the flowmeter if not flushed or
filtered from the process piping before installation and operation.
Before commissioning, the line should be filled slowly and carefully with
the medium.
A by-pass system is common for frequent system flushing or frequent meter
removal. If a by-pass system is not practical or possible, removal of the gears
before flushing is necessary (refer to section 9.1 “Disassembly of Pulse meter”).
For proper operation the flowmeter must be purged of air. During long periods of
inactivity or after a flushing, air may be in the piping. Elimination of the air may
be achieved by operating the meter at a low flow rate until all the air is eliminated.
Damage may occur to the flowmeter if it is run above the maximum rated flow
rate or if the maximum differential pressure of 15 psi (1 bar, 100 kPa) is
exceeded.
After mechanical and electrical installation according to the guidelines set forth
within this user manual, the DON flowmeter is ready for operation.
Warning!
Risk of damage by blocking of measuring mechanism.
A missing count signal may indicate a blocked measuring
mechanism. The resulting increase in pressure before the device
can lead to further damage to the unit and / or the plant. Remove
the unit or shut down the plant immediately, if an unplanned
absence of the counter signal takes place.
Eliminate the cause of the malfunction.
Summary of Contents for DON-130GA8
Page 1: ...Operating Instructions for Oval Gear Flow Meter Model DON Lx Hx Rx Dx Gx Kx Bx Zx M4...
Page 28: ...DON page 28 DON 01 1019 DON x25 to x40 DON x45 to x60...
Page 39: ...DON DON 01 1019 page 39 11 Pressure drop curves...
Page 40: ...DON page 40 DON 01 1019...
Page 49: ...DON DON 01 1019 page 49 18 Exd Certificate...
Page 50: ...DON page 50 DON 01 1019...
Page 51: ...DON DON 01 1019 page 51...
Page 52: ...DON page 52 DON 01 1019 19 IECEx Certificate...
Page 53: ...DON DON 01 1019 page 53...
Page 54: ...DON page 54 DON 01 1019...
Page 55: ...DON DON 01 1019 page 55...