SERIES TRACTOR OPERATION MANUAL
46
4.2.8
Hoist
tractor
When you want hoist tractor,
you should bundle up the
hoisting slings scurely and
suspend such as fig.5-1. Front
suspend on Frame,Rear
suspend on Drawbar.
After mak sure the hoisting
slings is confirmed, hoist
slowly and move the tractor
Put it to an appropriate
position .
The carrying capacity of
Crane must bigger than tractor technically permissible laden masses.
4.2.9
Jack
tractor
Fig4.15 shows the recommended jacking points of tractor by a jack of sufficient lifiting
capacity. The carrying capacity of Jack must bigger than tractor technically permissible
laden masses.
A
C
B
Fig.4-13
Fig.4.14 Hosit tractor
Summary of Contents for 404G2 Series
Page 1: ...OPERATION MANUAL 404G2 WWW KNEGT INTERNATIONAL COM...
Page 87: ...404G2 SERIES TRACTOR OPERATION MANUAL 85 Appendix 3 Scheme of the electric system...
Page 91: ...404G2 SERIES TRACTOR OPERATION MANUAL 89...
Page 94: ...404G2 SERIES TRACTOR OPERATION MANUAL 92...
Page 95: ...93...
Page 96: ...94...
Page 97: ...95...
Page 98: ...96...
Page 99: ...97...
Page 100: ...98...
Page 101: ...99...