background image

30 Simple 

Maintenance 

 

4.  Push out the light guide and strip the PTFE sealing ring in order to 

clean the lens. 

5.  Reassemble the cell in reverse order. Use a new PTFE sealing ring 

after every disassembly to ensure the consistence of the flow cell. 

 

Adjusting the path length of the preparative flow cells 

SOP  8 

Changing the path length 

This instruction applies to flow cells A4066, A4067 and A4068 with 1/8” 
and 1/4” connectors. Path lengths can be adjusted to 2, 1.25 and 0.5 
mm. On delivery the path length is set to 2 mm. To reduce the path 
length to 1.25 or 0.5 mm, follow the instructions given. 

1.  Unscrew the outer thread with the 3 mm hexagonal spanner.  
2.  Take out the stainless steel plain washer and the PEEK distance 

plate.  

3.  Remove the distance plate, put back the stainless steel washer 

and refasten the thread carefully.  

With the distance plate removed, the rod shaped light guide is pushed 
further into the flow cell (0.75 mm), thus resulting in a reduced path 
length of 1.25 mm. To reduce the path length further to 0.5 mm, follow 
the same procedure on the other side of the cell. 

To extend the path length again in steps of 0.75 mm, the PEEK 
distance plates have to be inserted again. 

4.  Loosen the outer thread, remove the stainless steel plain 

washers and take out the gasket holder by using a pair of 
tweezers.  

5.  Push the light guide approximately 1 mm to the outside to 

enlarge the path length. Use a clean cloth and do not touch the 
light guide with the fingers.  

6.  Put the gasket holder back into the cell.  
7.  Insert the PEEK distance plate again and then the plain washer.  
8.  Fasten the outer thread carefully.  

When fastening the threads, the rod shaped light guide is pushed back 
in the correct position inside the cell. Inserting a distance plate thus 
enlarges the path length for 0.75 mm. It is not necessary to change the 
PTFE sealing ring when adjusting the path length. 

Flow cells with fiber optical connectors 

Changing the path length of flow cells with fiber optical connectors can 
be done in the same way. In these cells the screwthread is replaced by 
a special adapter (Fig. 29). They additionally contain a lens to focus the 
light onto the optical fibers.  

Fiber optical connector with lensholder

Lens

PEEK shutter

PEEK distance plate

Gasket holder

Light guide with PTFE seal

 

Fig. 29 

Fiber optical connector of a preparative flow cell 

Summary of Contents for WellChrom K-2600

Page 1: ...mbH Hegauer Weg 38 D 14163 Berlin DEUTSCHLAND Telefon 49 0 30 80 97 27 0 Fax 49 0 30 801 50 10 Email info knauer net www knauer net User Manual Handbuch Fast scanning Spectro Photometer K 2600 Schnell...

Page 2: ...isplay and Menu Structure 10 Main Menu 10 Appearance of Cursor and Data Input 10 The SETUP Menu 11 Das GLP Menu 14 Das LINK Menu 14 The VIEW Menu 15 Direct Control of the K 2600 UV detector 15 Selecti...

Page 3: ...Durchflusszellen CE Zellen 32 Spare parts for flow cells 32 Analytical Cells 32 Preparative Cells 32 Technical Data 33 Declaration of conformity 34 Guarantee statement 35 I N H A L T Hinweise zum Geb...

Page 4: ...hluss 57 Fernsteuerungsanschluss 58 RS 232 Serielle Schnittstelle 58 Das KNAUER Netz 58 Liste der Displaymeldungen 59 Softwaresteuerung des K 2600 UV Detektors 59 Vorbereitung f r die Software Steueru...

Page 5: ...ss the corresponding arrow keys The triangles symbolize the use of corresponding arrow keys SOP s in this manual The Standard Operating Procedures SOP provided with this manual offer a convenient way...

Page 6: ...ly be installed by the user Data acquisition and control of the K 2600 UV detector are performed digitally and such allow trouble free operation of the instrument Two adjustable analog outputs and the...

Page 7: ...lease contact our service department if you miss something or if you need support Please fill out the guarantee registration card and return it to us immediately Power Supply ON OFF Self Tests The K 2...

Page 8: ...the K 2600 UV detector without fiber optical connectors Refer to Fig 2 Front panel of the K 2600 UV detector on page 8 1 Loosen the two Knurled cell screws 3 with the fingers and remove them 2 Pull ou...

Page 9: ...e AUTOZERO When pressed shortly this performs an auto zero over the whole wavelength range Pressing longer than two seconds starts a scan autozero SCAN The yellow colored SCAN key switches to the SCAN...

Page 10: ...01 ON 000 0 190 740 Hold 0 Time 1 2 Run 1 min nm nm LINK Menu VIEW Menu Link View SETUP Menu GLP Menu Setup GLP Fig 4 Overview menu structure Some menus consist of several pages indicated by a rhombus...

Page 11: ...nalytical purposes a time constant of 1s is best suited AUTO CALIBRATION Second line in the window TIME CONSTANT Moving to this field and pressing or starts the procedure for the calibration of the wa...

Page 12: ...eeds Load Edit Prog Events 2 Signal 1 Signal 2 Prog Clear 0 off 0 on 1 au au ANALOG OUT FULL SCALE 0 001 au 1V Hold 0 Time 1 2 Run 1 min nm nm Link View Setup GLP Fig 8 Menu for scaling the analog out...

Page 13: ...UV detector Additionally signal levels to be exceeded for fraction collection and a delay time respecting the dead volume of the capillaries between detector and collector can be set Load Edit Prog E...

Page 14: ...LP Last service 15 06 98 Setup GLP Main Menu Fig 10 Block diagram GLP menu Das LINK Menu The link menu is used when running links i e the pre defined run of program combinations In this menu the momen...

Page 15: ...s performed via operation screen Many functions like choice of wavelength s except scanning can be controlled from the operation screen Programs can be used for determining and changing wavelengths or...

Page 16: ...ent ratio plots are available Wavelength 1 divided through wavelength 2 and vice versa Ratio plots are indicated by symbol 1 2 and respectively 2 1 at the decimal point of the absorption value Fig 14...

Page 17: ...time is fixed appears on editing this line The maximum value for time is 999 min To edit a new time line move the cursor to the time field and press If this line is empty in the time field will be dis...

Page 18: ...ocket using signal level and a defined time window 1 Enter the SETUP menu and proceed to the window FRACTION see Fig 9 on page 13 2 Enter the desired value for the signal level e g 0 32 AU the delay v...

Page 19: ...ime 1 2 Run 1 min nm nm Link View Setup GLP A B C D Fig 16 Four steps for creating a program Program Execution Programs must be activated prior to execution Enter the desired program number in the fie...

Page 20: ...this input the system switches into mode RUN Creating Program Links Program links are cross references to existing programs which can be defined and edited similar to programs themselves Links cannot...

Page 21: ...er in the Load Prog field e g 22 for L2 and confirm by pressing any arrow key During the execution of a link the LINK menu is available in addition to the common display In the LINK menu the momentary...

Page 22: ...bles choosing the scan number to save the scan data choosing the wavelength range for the scan and serves for giving out the stored scan data Load Edit Prog Events 2 Signal 1 Signal 2 Prog Clear 0 off...

Page 23: ...n button a second time a scan is performed immediately For taking different scans during a run please be sure to adjust the scan number between scans Stored scans are overwritten without any message w...

Page 24: ...into the square opening of the selected connector of the plug strip 2 Press the catch down as indicated by arrow 3 Insert the uninsulated end of the cable into the opening under the catch 4 Release th...

Page 25: ...output is active fo r 500 ms when a prgram or link is started EXT and AUTOZERO allow for external analog control of the photometer if the option ANALOG is choosen in the SETUP menu die Option gew hlt...

Page 26: ...device and so on The ring is closed by connecting the RS 232 interface of the last device to the free interface of the first one List of display messages The following list shows display messages pos...

Page 27: ...K 1000 or K 1001 can be connected to the computer in digital communication network the KNAUER net see chapter RS 232 Serial Interfaces on page 25 The serial port of the computer is connected to one o...

Page 28: ...ening Please let the lamp cool down for at least 15 minutes after switching it off SOP 5 Changing the lamp 1 Unscrew the housing and remove it by lifting 2 The lamp is located in a black housing on th...

Page 29: ...h Be careful not to touch the clean lenses with the fingers 4 Reassemble the cell in the reverse manner making sure that the PTFE seal does not block the light path 5 Tighten the outer threads careful...

Page 30: ...f the cell To extend the path length again in steps of 0 75 mm the PEEK distance plates have to be inserted again 4 Loosen the outer thread remove the stainless steel plain washers and take out the ga...

Page 31: ...4071 Deuterium lamp A4072 Halogen lamp A4073 Halogen lamp with socket needed for first installation of a halogen lamp M1642 Power supply cable A0884 RS 232 connection cable A0755 Y shaped RS 232 cable...

Page 32: ...tive Cells A4066 0 5 1 25 2 mm 1 8 stainless steel 1 000 200 A4067 0 5 1 25 2 mm 1 8 PEEK 1 000 100 A4068 0 5 1 25 2 mm 1 4 stainless steel 10 000 200 A4069 0 5 mm 1 16 stainless steel 250 200 A4095 0...

Page 33: ...2 x 10 5 AU at 240 300nm 1 0 s Baseline drift 1 10 x 10 5 AU h at 240 nm 1 0s 2 15 x 10 5 AU h at 240 300nm 1 0 s Time constants 0 1 0 2 0 5 1 0 2 0 5 0 10 0 s Scalable 0 1 V 1 0 V 10 V integrator out...

Page 34: ...wing requirements and product specifications Low Voltage Ordinance 73 23 EWG EN 61010 1 1993 Engineering Guidelines 89 392 EWG EMV Ordinance 89 336 EWG EN 50081 1 1992 EN 55011 1991 Class B EN 55022 1...

Page 35: ...overed by the guarantee Claims under this guarantee are valid only if the enclosed guarantee card is returned to us at the address shown below within 14 days of receipt of the instrument Defective det...

Page 36: ......

Page 37: ...ymbolisieren die selbstdefinierende Verwendung der entsprechenden Pfeiltasten SOP s in diesem Handbuch Die Standardarbeitsanweisungen Standard Operating Procedures SOP dieses Handbuches erm glichen di...

Page 38: ...e Halogenlampe eingesetzt werden Die Datenerfassung und die Steuerung des K 2600 UV Detektors erfolgen digital wodurch ein St rungsfreies Arbeiten des Ger tes gew hrleistet wird Zwei einstellbare Anal...

Page 39: ...gliche Transportsch den und machen Sie ggf Schadenersatzanspr che sofort beim Transportunternehmen geltend Bitte berpr fen Sie anhand der Packliste das Zubeh r auf Vollst ndigkeit Sollte trotz unsere...

Page 40: ...llation der Messzelle Die Lieferkonfiguration des K 2600 UV Detektors beinhaltet keine Messzelle Vor dem Einsatz des Photometers muss eine K vette aus der Palette der von KNAUER lieferbaren Messzellen...

Page 41: ...ositionierung auf dem Display und zur Best tigung der Eingabewerte Nummerische Tasten Alle zehn nummerischen Tasten erm glichen die Eingabe numerischer Werte an der Cursorposition In bestimmten Men s...

Page 42: ...r oder Integrator Betrieb des Photometers Display und Men struktur Nach dem Einschalten des Ger tes siehe Kapitel Stromversorgung Ein Aus Autotest auf Seite 39 ist das Ger t einsatzbereit wie auf dem...

Page 43: ...et tigung einer beliebigen Pfeiltaste Der Eingabemodus wird automatisch beendet wenn innerhalb eines Zeitlimits von 60 Sekunden keine Taste bet tigt wurde Das SETUP Men Im SETUP Men k nnen die Paramet...

Page 44: ...d f r die Lampenbetriebszeit k nnen Sie ein manuelles Reset nach entsprechender Kontrollfrage des Ger tes vornehmen Auch hiermit ist ein automatisches Inkrementieren der Lampennummer verbunden Diese F...

Page 45: ...ich Sie k nnen einen Abgleich zu beiden Integratorausg ngen setzen Die Ausgangsspannung der Ausg nge wird beim Selbsttest auf Null gestellt In diesem Fenster k nnen Sie einen nummerischen Wert f r ein...

Page 46: ...etektor und Sammler Ber cksichtigung findet Load Edit Prog Events 2 Signal 1 Signal 2 Prog Clear 0 off 0 on 1 au au FRACTION delay 090 0 s level 0 3205 au Hold 0 Time 1 2 Run 1 min nm nm Link View Set...

Page 47: ...st service 15 06 98 Setup GLP Main Menu Abb 10 Blockdiagramm des GLP Men s Das LINK Men Das Link Men wird f r den Ablauf vordefinierter Programm kombinationen genutzt In diesem Men kann der momentane...

Page 48: ...s Direkte Steuerung des K 2600 UV Detektors Die direkte Steuerung des K 2600 UV Detektors erfolgt ber das Steuerfeld Viele Funktionen wie die Festlegung der Wellenl nge n mit Ausnahme des Scannens k n...

Page 49: ...gezeigt siehe Abb 14 Ausgabe Optionen Die Ausgabe der Absorptionssignale kann konfiguriert werden Bewegen Sie den Cursor zu den Signalfeldern W hlen Sie die gew nschte Option durch Bet tigung einer be...

Page 50: ...t Der K 2600 UV Detektor kann bis zu zwanzig Programme speichern Durch Setzen des Cursors in das VIEW Men k nnen Sie die Verf gbarkeit und die Zuordnung der Programmnummern berpr fen Benutzen Sie den...

Page 51: ...m bleibt solange konstant erhalten wie keine nderungen vorgenommen werden 6 Wiederholen Sie die beiden letzten Schritte um den Zeitschritt 20 0 min zu definieren und geben Sie f r 1 280 nm ein Das Dis...

Page 52: ...ff 0 on 1 au au 01 03 00 ON 010 0 240 254 Hold 0 Time 1 2 Run 1 min nm nm Link View Setup GLP A B C D Abb 16 Vier Schritte zur Erzeugung eines Programms Der im SETUP Men ausgew hlte Wert f r die Signa...

Page 53: ...tzeiteinstellungen zur ck Diese Ausgangsparameter werden auch nach komplettem Programmablauf wieder aktiviert Ein Programm kann auch ber den START IN Eingang auf der Ger ter ckseite gestartet werden W...

Page 54: ...Prog Events 2 Signal 1 Signal 2 Prog Clear 0 off 0 on 1 au au L2 No P R Wait Hold 0 Time 1 2 Run 1 min nm nm Link View Setup GLP Load Edit Prog Events 2 Signal 1 Signal 2 Prog Clear 0 off 0 on 1 au a...

Page 55: ...zung des Wake Up Programms In diesem Fenster k nnen die gew nschten Werte f r die Programmnummer Datum und Uhrzeit mittels der Zahlentasten eingegeben werden Beim Laden des Wake Up Programms wird die...

Page 56: ...en mindestens eine Sekunde andauernden Druck auf die Autozerotaste ausgel st Das Autozero wird dann f r den ausgew hlten Wellenl ngenbereich des Scans gemessen und berechnet Durchf hrung von Wellenl n...

Page 57: ...er SOP 4 Montage der Anschlussstecker 1 F hren Sie die abgerundete Seite des Hebelwerkzeugs am ausgew hlten Anschluss in die quadratische ffnung des Steckers 2 Dr cken Sie den Hebel wie durch den Pfei...

Page 58: ...rogrammverkn pfung gestartet wird EXT and AUTOZERO erlauben die externe Analogsteuerung des Photometers wenn im SETUP Men die Option ANALOG gew hlt wurde siehe Abschnitt STEUERUNG auf Seite 45 Abb 22...

Page 59: ...e zeigt die w hrend des Betriebes Ihres K 2600 UV Detektors m glichen Displaymeldungen in der Reihenfolge Ihrer Erw hnung in diesem Handbuch HPLC SPECTRALPHOTOMETER 40 Start time is fixed 50 Delete th...

Page 60: ...d die Pumpen K 1000 und K 1001 k nnen mit dem Computer in einem digitalen Kommunikationsnetzwerk dem KNAUER Netz verbunden werden siehe Kapitel RS 232 Serielle Schnittstelle auf Seite 58 Der serielle...

Page 61: ...Deuteriumlampe durch eine neue ersetzt werden Lampenwechsel Ziehen Sie den Netzstecker heraus bevor Sie das Ger t ffnen Bitte lassen Sie die Lampe mindestens 15 Minuten nach dem Ausschalten abk hlen S...

Page 62: ...rze Linsenhalterung mit einer Pinzette oder durch vorsichtiges Abtippen auf eine saubere Fl che Die in die Halterung eingelagerte Linse ist gegen den Flie pfad mit einer PTFE Dichtung abgedichted Dies...

Page 63: ...ie bitte folgenderma en 1 L sen Sie den Gewindering mit einem Inbusschl ssel 2 Entfernen Sie den ebenen Edelstahldichtungsring und die PEEK Distanzscheibe 3 Setzen Sie den Edelstahlring wieder ein und...

Page 64: ...anschluss einer pr parativen Messzelle Ersatzteile und Zubeh r Standardauslieferung WellChrom K 2600 UV Detektor ohne Messzelle Bedienungshandbuch Netzanschlusskabel 230 V RS 232 Kabel 2 Integratorkab...

Page 65: ...rative Durchflusszellen A4066 0 5 1 25 2 mm 1 8 Edelstahl 1 000 200 A4067 0 5 1 25 2 mm 1 8 PEEK 1 000 100 A4068 0 5 1 25 2 mm 1 4 Edelstahl 10 000 200 A4069 0 5 mm 1 16 Edelstahl 250 200 A4095 0 5 mm...

Page 66: ...240 300nm 1 0 s Basisliniendrift 1 10 x 10 5 AU h at 240 nm 1 0s 2 15 x 10 5 AU h at 240 300nm 1 0 s Zeitkonstanten 0 1 0 2 0 5 1 0 2 0 5 0 10 0s Skalierbarer 0 1 V 1 0 V 10 V in Integratorausgang 16...

Page 67: ...und Produktspezifikationen entspricht Niederspannungverordnung 73 23 EWG EN 61010 1 1993 Maschinenrichtlinie 89 392 EWG EMV Verordnung 89 336 EWG EN 50081 1 1992 EN 55011 1991 Klasse B bzw EN 55022 1...

Page 68: ...tektors direkt an das Herstellerwerk Wissenschaftliche Ger tebau Dr Ing Herbert Knauer GmbH Hegauer Weg 38 D 14163 Berlin Tel 030 809 727 0 Fax 030 801 50 10 e Mail info knauer net www knauer net Die...

Reviews: